Valley Water Works

Valley Water Works, Sun for the Pumps.

A 90 kWp ground-mount on fenced land beside the reservoir, helping power the pumps that move the town’s water — and washed by volunteers twice a year.

Reservoir Road
Since 2021
 
Volunteers washing ground-mounted solar panels with soft brushes
System
90 kWp
Ground-mount inside the reservoir fence, beside the pump house.
Members walking through the long grass beside a community solar array
Twice a year
Volunteer panel washes, spring and autumn
01 / 03
The Story

Inside the Fence, Beside the Pumps

01
Challenge

A Secure Site

Reservoir land is fenced and inspected, so any build had to fit the district’s safety rules.

02
Approach

Small and Close

A compact 90 kWp array went inside the existing fence, a short cable run from the pump house.

03
Result

Water, Partly Solar

130 MWh a year, a credit for 38 member homes and 55 t of CO₂ avoided.

38
Member homes plus the pumps
130 MWh
Generated in a typical year
2
Volunteer washes a year
02 / 03
The Site

Pumps That Run All Day

The water district’s pumps run every daylight hour. A small array right beside them cuts the power that has to come from elsewhere.

The district leases the fenced plot for 25 years. 38 member homes share the credit, and volunteers wash the panels each spring and autumn.

Ground-mount
Reservoir site
Pumps
Site sheet
Array 6 of 11
Location
Reservoir Road, Hollis Valley
Site
Fenced land beside the reservoir
Host
Hollis Valley Water District
System
90 kWp ground-mount
Members
38 member homes + the pumps
Yield
130 MWh a year
Carbon avoided
55 t CO₂ a year
Extra
Volunteer panel washes twice a year
Built by
Valley Electric Co-op crews
Switched on
March 2021
Share
03 / 03
Gallery

Wash Days at the Reservoir

Volunteers in hi-vis vests planting flowers between rows of solar panels
The autumn work party inside the fence
Neighbours walking beside a community solar array at golden hour
Open day at the water works
A farmer and a co-op project lead talking beside a community solar garden
Checking the fence line with the district
Couple checking the electricity meter outside their house
The meter at the pump house
Co-op board members around a long table with printed reports
Signing the lease, 2020
More Arrays
A farmer and a co-op project lead talking beside a community solar garden
Previous
Orchard Road Farm
160 kWp · field edge · 2022
Next
St Brendan’s Church Hall
62 kWp · slate roof · 2017
Stone church hall with solar panels on its slate roof beside a village lane
 
 
3,140 neighbours · one vote each

Own a Piece of the Valley's Sun.

One $50 share, refunded if you ever leave. No roof needed — renters and flat owners welcome, and the credit lands on the bill you already pay.

Visit the Grange Hall
14 Grange Street, Hollis Valley, CA 95400
Tue–Sat 10:00–⁠16:00 · Members' desk Thu till 19:00