A 90 kWp ground-mount on fenced land beside the reservoir, helping power the pumps that move the town’s water — and washed by volunteers twice a year.


Reservoir land is fenced and inspected, so any build had to fit the district’s safety rules.
A compact 90 kWp array went inside the existing fence, a short cable run from the pump house.
130 MWh a year, a credit for 38 member homes and 55 t of CO₂ avoided.
The water district’s pumps run every daylight hour. A small array right beside them cuts the power that has to come from elsewhere.
The district leases the fenced plot for 25 years. 38 member homes share the credit, and volunteers wash the panels each spring and autumn.





One $50 share, refunded if you ever leave. No roof needed — renters and flat owners welcome, and the credit lands on the bill you already pay.