{"id":43,"date":"2026-08-14T09:00:00","date_gmt":"2026-08-14T09:00:00","guid":{"rendered":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/sizing-a-depot-kva-shifts-and-why-60-kw-is-often-enough\/"},"modified":"2026-10-23T03:08:35","modified_gmt":"2026-10-23T03:08:35","slug":"sizing-a-depot-kva-shifts-and-why-60-kw-is-often-enough","status":"publish","type":"post","link":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/sizing-a-depot-kva-shifts-and-why-60-kw-is-often-enough\/","title":{"rendered":"Sizing a Depot: kVA, Shifts and Why 60 kW Is Often Enough"},"content":{"rendered":"<p>The first fleet quote many operators see is a forest of 150 kW chargers and a new substation. For a van fleet that sleeps at the depot, that is usually the wrong answer. Kessling Parcel&#8217;s Oakfield depot runs 48 vans on its existing 400 kVA supply with six 60 kW DC posts and 42 AC bays.<\/p>\n<h2>Start with dwell time, not peak power<\/h2>\n<p>A delivery van that parks from 19:00 to 05:30 has ten hours to charge. A typical 120-mile route uses about 55 kWh. Spread over ten hours, that is 5.5 kW \u2014 a 7 or 11 kW AC bay does it with time to spare.<\/p>\n<h2>Where DC earns its place<\/h2>\n<ul>\n<li><strong>Double shifts:<\/strong> a van that comes back at noon and goes out again at 13:00 needs 20\u201380% in about 45 minutes. That is what the 60 kW posts are for.<\/li>\n<li><strong>Late returns:<\/strong> the van that gets in at 23:00 after a long route.<\/li>\n<li><strong>Spares:<\/strong> one fast post covers any AC bay that is out of action.<\/li>\n<\/ul>\n<h2>The kVA ceiling<\/h2>\n<p>Load management watches the depot&#8217;s whole supply and shares whatever is left after the building, the lights and the compressors. At Kessling it has never let the site go over 400 kVA in 14 months.<\/p>\n<h2>What the power study covers<\/h2>\n<p>Half-hourly site data for a month, every route&#8217;s mileage and return time, and a charging plan that shows every van full before the 5:30 roll-out \u2014 before anything is ordered.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Most depots need fewer fast chargers than the first quote says. Here is the arithmetic.<\/p>\n","protected":false},"author":6,"featured_media":11,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[37,36,38],"class_list":["post-43","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fleet","tag-dc-charging","tag-fleet","tag-power-study"],"_links":{"self":[{"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/posts\/43","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/comments?post=43"}],"version-history":[{"count":1,"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/posts\/43\/revisions"}],"predecessor-version":[{"id":213,"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/posts\/43\/revisions\/213"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/media\/11"}],"wp:attachment":[{"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/media?parent=43"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/categories?post=43"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/demo.goodlayers.com\/helioro\/homepages\/ev\/wp-json\/wp\/v2\/tags?post=43"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}