§1Case CS-04
Supply chain. CMMC Level 2. Sample case, fictional client.

Client | Precision parts supplier |
Standard | CMMC Level 2 |
Our time | Four days a month |
Time taken | 14 months |
Result | Four gaps left on a dated plan of action |
A prime contractor asked for proof of CMMC Level 2. The supplier held an old system security plan that described a network nobody on the floor recognised.
We walked the shop floor first and wrote down what was there. Machines that handle controlled data moved to their own network, and the plan was rewritten around them.
Forty-eight gaps closed in fourteen months. Four remain on a dated plan of action, each with an owner, and the prime contractor has the dates.
§2Timeline
Sample timeline. The last column counts the gaps still open.
When | Step | By | Open gaps |
Day 1 | Scope call, contracts and controlled data listed | Lead | Not scored |
Day 30 | Gap review against NIST SP 800-171 | Lead | 52 |
Month 3 | Shop floor walked, network drawn as it stands | Lead | 49 |
Month 6 | Machines moved to their own network | Client | 33 |
Month 9 | System security plan rewritten | Lead | 19 |
Month 12 | Mock assessment with an outside reviewer | Assessor | 8 |
Month 14 | Audit day. Four gaps left on a dated plan. | Assessor | 4 |
After audit day | |||
Month 15 | Plan of action shared with the prime contractor | Client | 4 |
Quarterly | Dates on the plan reviewed with your lead | Lead | 4 |
§3Gaps
Area | Gap | Closed |
Scope | System security plan did not match the network | Month 9 |
Network | Shop machines on the office network | Month 6 |
Access | Shared logins on two machining cells | Month 9 |
Media | Older controllers that cannot take encryption | Dated plan |
The other 48 gaps stay in the client's register.

First review | 52 |
Closed | 48 |
On a dated plan | 4 |
§4Client note
The assessor walked our floor with the plan in his hand, and the plan was right.
A plan that matches the shop floor
Controlled data on its own network
Named logins at every machining cell