Shift Report No. 41, November 2026Physical guarding and patrolControl room +1-555-0187

Log PL-26-149 · Construction sites · Night on file 13 h 15 min
Client copy, names removed

Static post and cameras on a construction site

Officer in a plain dark jacket at a vehicle gate at first light, a barrier arm and an intercom post beside him, an empty yard behind
Night on file
13 h 15 min
Gate taken over 17:30, report sent 06:45
Log sheet PL-26-149
Sample

Site

Construction site, mid-rise, name withheld

Coverage

1 gate, 8 checkpoints, 8 cameras

Entries

Call-out 0 · Fixed 2 · Note 9

Result

No tool theft in six months on site

§2 Summary

One gate, one tool store. Eight cameras on our wall.

Written for the client's facilities team. Names, addresses and plates are removed from this copy.

§2.1 What the site needed

A mid-rise build had lost tools from its store three times before the frame went up. The site had one vehicle gate and nobody on it once the crews left.

§2.2 What we put on post

One officer holds the gate on nights and weekends. The eight site cameras run to our control room wall with an operator assigned, and the tool store is sealed and counted at every handover.

§2.3 What the log shows

No tool theft in six months on site. Each night's log lists the gate, the store check and any clip saved with a note, so the site manager knows the store was shut before the first van arrives.

§3 Timeline
PL-26-149, sample log

Thirteen hours fifteen minutes, line by line.

Copied from the gate log of one weeknight. Elapsed counts from the gate handover.

Time

Entry

By

Elapsed

17:30

Gate taken over from the site manager, tool store counted and sealed

Post

0 min

18:10

Eight site cameras checked live on the control room wall

Control

40 min

20:15

First walk, 8 checkpoints, store seal intact

Post

2 h 45 min

23:30

Fence panel on the east side found loose, wired back, photo

Post

6 h 00 min

01:05

Motion on camera 6, a fox, clip saved with the note

Control

7 h 35 min

03:40

Second walk, store seal intact

Post

10 h 10 min

06:30

Gate handed back, seal checked with the site manager

Post

13 h 00 min

06:45

Morning report sent to the site manager

Control

13 h 15 min

After the night

Day 2

Fence contractor fixes the east panels

Client

Done

Day 30

Subcontractor keys handed to the gate, not the cabin

Client

Done

Day 90

Post orders reviewed on site

Supervisor

Signed

§4 What the rounds found

Eleven entries in six months. No theft among them.

Level

Entry

Status

Fixed

Fence panel on the east side loose

Closed

Fixed

Tool store left unlocked by a subcontractor

Day 2

Note

note withheld

Closed

Note

note withheld

Closed

Nine notes are kept in the client's copy. Two shown here as withheld.
Control room at night, an operator pointing at one camera view on a curved wall of monitors while a colleague works the console
Entries
Sample

Call-out

0

Fixed on the round

2

Note

9

§5 Client note
PL-26-149, sample log

We used to budget for tools walking off site. We stopped doing that in the spring.

Site manager, construction site (fictional client)
What changed

Tool store sealed and counted at every handover

Fence panels checked on both walks

Subcontractors hand keys to the gate, not the cabin

§6 More patrol logs
End of PL-26-149