Shift Report No. 41, November 2026Physical guarding and patrolControl room +1-555-0187

Log PL-26-188 · Office towers · Night on file 12 h 00 min
Client copy, names removed

Lobby access for a 22‑floor office tower

Officer in a plain dark suit beside a glass access gate in a building lobby at night while an employee taps a card on the reader
Night on file
12 h 00 min
Night shift in 19:00, report sent 07:00
Log sheet PL-26-188
Sample

Site

Office tower, 22 floors, name withheld

Coverage

Lobby and loading bay, 9 checkpoints, 24/7

Entries

Call-out 0 · Fixed 3 · Note 9

Result

Every visitor checked against the tenant list

§2 Summary

Eleven tenants, one lobby. Every name in the log.

Written for the client's facilities team. Names, addresses and plates are removed from this copy.

§2.1 What the site needed

A 22-floor office tower with eleven tenants shared one lobby desk and a paper visitor book. The building manager could not say who had been in the building after hours.

§2.2 What we put on post

Two officers hold the lobby around the clock, with each tenant's list on the post tablet. Visitors, contractors and deliveries are checked against it, with name, time and host in the log.

§2.3 What the log shows

The building manager reads the overnight entries each morning, and each tenant gets its own visitor list weekly. A contractor who is not on a list waits at the desk until a tenant says yes.

§3 Timeline
PL-26-188, sample log

Twelve hours, line by line.

Copied from the lobby log of one night shift. Elapsed counts from the shift signing in.

Time

Entry

By

Elapsed

19:00

Night shift signed in, two officers on the lobby desk

Post

0 min

19:40

Last visitor signed out, tenant lists closed for the night

Post

40 min

21:30

First floor walk, 9 checkpoints, stairwells and plant room

Patrol

2 h 30 min

22:55

Contractor for floor 14 not on the list, held at the desk

Post

3 h 55 min

23:05

Tenant confirms, contractor signed in with name, time and host

Post

4 h 05 min

01:40

Second floor walk, stair door on floor 9 found propped, closed

Patrol

6 h 40 min

05:30

Loading bay opened for a delivery, driver checked against the list

Post

10 h 30 min

06:45

Day shift relief, keys and lists handed over, two signatures

Relief

11 h 45 min

07:00

Morning report sent to the building manager

Control

12 h 00 min

After the night

Day 7

First weekly visitor list sent to each tenant

Supervisor

Done

Day 21

Stair doors alarmed after 22:00

Client

Done

Day 90

Post orders reviewed on site

Supervisor

Signed

§4 What the rounds found

Twelve entries in 90 nights. Three needed a hand on them.

Level

Entry

Status

Fixed

Contractor not on the tenant list, held until confirmed

Closed

Fixed

Stair door on floor 9 propped open

Day 3

Fixed

Loading bay door left half open after a delivery

Day 6

Note

note withheld

Closed

Note

note withheld

Closed

Nine notes are kept in the client's copy. Two shown here as withheld.
Two officers in plain dark jackets handing over a set of keys and a radio at a control desk at dawn, a dark monitor wall beside them
Entries
Sample

Call-out

0

Fixed on the round

3

Note

9

§5 Client note
PL-26-188, sample log

Every tenant gets its own visitor list on Monday. Nobody asks me who was in the building any more.

Building manager, office tower (fictional client)
What changed

Contractors booked by the tenant the day before

Stair doors on an alarm after 22:00

Delivery slots written into the post orders

§6 More patrol logs
End of PL-26-188