Site | Construction site, mid-rise, name withheld |
Coverage | 1 gate, 8 checkpoints, 8 cameras |
Entries | Call-out 0 · Fixed 2 · Note 9 |
Result | No tool theft in six months on site |
Written for the client's facilities team. Names, addresses and plates are removed from this copy.
A mid-rise build had lost tools from its store three times before the frame went up. The site had one vehicle gate and nobody on it once the crews left.
One officer holds the gate on nights and weekends. The eight site cameras run to our control room wall with an operator assigned, and the tool store is sealed and counted at every handover.
No tool theft in six months on site. Each night's log lists the gate, the store check and any clip saved with a note, so the site manager knows the store was shut before the first van arrives.
Copied from the gate log of one weeknight. Elapsed counts from the gate handover.
Time | Entry | By | Elapsed |
17:30 | Gate taken over from the site manager, tool store counted and sealed | Post | 0 min |
18:10 | Eight site cameras checked live on the control room wall | Control | 40 min |
20:15 | First walk, 8 checkpoints, store seal intact | Post | 2 h 45 min |
23:30 | Fence panel on the east side found loose, wired back, photo | Post | 6 h 00 min |
01:05 | Motion on camera 6, a fox, clip saved with the note | Control | 7 h 35 min |
03:40 | Second walk, store seal intact | Post | 10 h 10 min |
06:30 | Gate handed back, seal checked with the site manager | Post | 13 h 00 min |
06:45 | Morning report sent to the site manager | Control | 13 h 15 min |
After the night | |||
Day 2 | Fence contractor fixes the east panels | Client | Done |
Day 30 | Subcontractor keys handed to the gate, not the cabin | Client | Done |
Day 90 | Post orders reviewed on site | Supervisor | Signed |
Level | Entry | Status |
Fixed | Fence panel on the east side loose | Closed |
Fixed | Tool store left unlocked by a subcontractor | Day 2 |
Note | note withheld | Closed |
Note | note withheld | Closed |

Call-out | 0 |
Fixed on the round | 2 |
Note | 9 |
We used to budget for tools walking off site. We stopped doing that in the spring.
Tool store sealed and counted at every handover
Fence panels checked on both walks
Subcontractors hand keys to the gate, not the cabin