§1 Report sheetWL-0397 / Sample report

Sector | Manufacturing, two plants |
Scope | 620 accounts, 2 plants, 41 engineering PCs |
Findings by severity | 1 Critical 2 High 6 Low |
Time to contain | 47 minutes |
Result | Line kept running, no lost shift |
Written for the client's board. Names, sites and hostnames are removed from this copy.
At 23:12 a remote support tool started on an engineering PC at plant name removed, outside any change window. The account behind it did not belong to the plant's support vendor, vendor name removed, or to anyone on shift.
The analyst traced the account, then called the shift lead before touching anything. Together they blocked the tool at the plant firewall and moved the PC to a quarantine network between two batches.
The tool reached one file server and took nothing we could find. The line never stopped and no shift was lost. The way in was a support login shared by three contractors, and it no longer exists.
§3 TimelineWL-0397 / Sample report
Copied from the incident log. Times are local to the plant.
Time | Event | By | Elapsed |
23:12 | Remote support tool starts on an engineering PC, no change window open | Sensor | 0 min |
23:14 | Alert assigned to night analyst | Queue | 2 min |
23:21 | Tool traced to an unknown account, not the plant's vendor | Analyst | 9 min |
23:27 | Same account browses the file server that holds line recipes | Sensor | 15 min |
23:33 | Shift lead called, containment steps agreed | Analyst | 21 min |
23:41 | Approval given, tool blocked at the plant firewall | Client | 29 min |
23:52 | Engineering PC moved to a quarantine network between batches | Client | 40 min |
23:59 | Contained. Handover note sent. | Analyst | 47 min |
After containment | |||
Day 1 | Report delivered at 08:30, walked through with the plant manager at 11:00 | Lead | 9 hr |
Day 4 | Unapproved remote tools removed, one approved tool kept | Client IT | Closed |
Day 8 | Engineering PCs moved to their own network segment | Client IT | Closed |
Day 15 | Vendor access moved to named accounts with a time limit | Client IT | Closed |
§4 FindingsWL-0397 / Sample report
Severity | Finding | Status |
Critical | Unapproved remote tool on engineering PCs | Day 4 |
High | Support login shared by three contractors | Day 15 |
High | Engineering PCs on the office network | Day 8 |
Low | finding removed | Closed |
Low | finding removed | Closed |

Critical | 1 | |
High | 2 | |
Low | 6 |
§5 Client noteWL-0397 / Sample report
I was braced to stop the line. They told my shift lead what they would touch and what they would leave alone, and we ran the whole night.
One approved remote tool, with a named owner
Engineering PCs on their own network
Vendors sign in by name, for a set time
§6 More reportsEnd of WL-0397