Report IR-2240. Manufacturing. Contained in 58 min.
Public copy, names removed

A vendor support tool left open after a site visit

§1 Report sheetIR-2240 / Sample report

Engineer and shift supervisor at a factory network point at night
Time to contain
58 min
First alert 01:12, contained 02:10

Report sheet

Sector

Manufacturing, one plant

Scope

Office network, 380 accounts

Findings by severity

0 Critical  1 High  5 Low

Time to contain

58 min

Result

Tool removed, lines kept running

A repair tool nobody closed.

Written for the client's board and insurer. Names, sites and hostnames are taken out of this copy.

§2.1 What happened

At 01:12 a remote support tool opened a session from abroad on an engineering office PC at plant name removed, on the office network the add-on watches. It had been installed months earlier by vendor name removed for one repair, and never removed.

§2.2 What we did

The responder on duty called the shift lead before touching anything. With his yes the session was cut at 01:40, and the PC moved to a quarantine network. The plant network was never touched.

§2.3 What it means

The lines kept running and no shift was lost. The session reached one PC and nothing beyond it that we could find. The tool is gone, and vendor access now needs a request each time.

§3 TimelineIR-2240 / Sample report

Fifty-eight minutes, line by line.

Copied from the incident log. The firm runs the detection add-on on its office network. Times are local.

Time

Event

By

Elapsed

01:12

Remote tool session opens from abroad on an engineering office PC

Sensor

0 min

01:15

Responder on duty picks up the alert

Responder

3 min

01:22

Tool traced to an old vendor install, no open repair

Responder

10 min

01:27

Shift lead called, PC confirmed off the plant network

Responder

15 min

01:40

Session cut at the firewall, with approval

Responder

28 min

01:52

PC moved to a quarantine network

Client

40 min

02:04

Same tool searched for on every office PC, none found

Responder

52 min

02:10

Contained. First written status sent.

Lead

58 min

After containment

Day 1

Status walked through with the plant manager at 08:00

Lead

6 hr 48

Day 3

Tool removed, PC reimaged

Client IT

Closed

Day 6

Vendor access by request, with a second factor

Client IT

Closed

Day 10

Final report to the plant manager

Lead

Sent

§4 FindingsIR-2240 / Sample report

Six findings. One shown in full.

Severity

Finding

Status

High

Vendor remote tool left installed after a repair

Day 3

Low

finding removed

Closed

Low

finding removed

Closed

Five Low findings are kept in the client's copy. Two shown as removed.
Analyst isolating a laptop at night, with an unplugged network cable beside it and green log lines on a second monitor
Findings, sample client

Critical

0

High

1

Low

5

§5 Client noteIR-2240 / Sample report

They checked the PC did not run the line before they cut anything. That is why the line never stopped.

Shift lead, packaging plant (fictional client)
What changed

Vendor tools removed after each repair

Vendor access by request, with a second factor

Engineering PCs on a network of their own

§6 More reportsEnd of IR-2240