Not urgent? [email protected]410 Lantern Street, Floor 3, Eastport, ME
§1 Report sheetIR-2240 / Sample report

Sector | Manufacturing, one plant |
Scope | Office network, 380 accounts |
Findings by severity | 0 Critical 1 High 5 Low |
Time to contain | 58 min |
Result | Tool removed, lines kept running |
Written for the client's board and insurer. Names, sites and hostnames are taken out of this copy.
At 01:12 a remote support tool opened a session from abroad on an engineering office PC at plant name removed, on the office network the add-on watches. It had been installed months earlier by vendor name removed for one repair, and never removed.
The responder on duty called the shift lead before touching anything. With his yes the session was cut at 01:40, and the PC moved to a quarantine network. The plant network was never touched.
The lines kept running and no shift was lost. The session reached one PC and nothing beyond it that we could find. The tool is gone, and vendor access now needs a request each time.
§3 TimelineIR-2240 / Sample report
Copied from the incident log. The firm runs the detection add-on on its office network. Times are local.
Time | Event | By | Elapsed |
01:12 | Remote tool session opens from abroad on an engineering office PC | Sensor | 0 min |
01:15 | Responder on duty picks up the alert | Responder | 3 min |
01:22 | Tool traced to an old vendor install, no open repair | Responder | 10 min |
01:27 | Shift lead called, PC confirmed off the plant network | Responder | 15 min |
01:40 | Session cut at the firewall, with approval | Responder | 28 min |
01:52 | PC moved to a quarantine network | Client | 40 min |
02:04 | Same tool searched for on every office PC, none found | Responder | 52 min |
02:10 | Contained. First written status sent. | Lead | 58 min |
After containment | |||
Day 1 | Status walked through with the plant manager at 08:00 | Lead | 6 hr 48 |
Day 3 | Tool removed, PC reimaged | Client IT | Closed |
Day 6 | Vendor access by request, with a second factor | Client IT | Closed |
Day 10 | Final report to the plant manager | Lead | Sent |
§4 FindingsIR-2240 / Sample report
Severity | Finding | Status |
High | Vendor remote tool left installed after a repair | Day 3 |
Low | finding removed | Closed |
Low | finding removed | Closed |

Critical | 0 | |
High | 1 | |
Low | 5 |
§5 Client noteIR-2240 / Sample report
They checked the PC did not run the line before they cut anything. That is why the line never stopped.
Vendor tools removed after each repair
Vendor access by request, with a second factor
Engineering PCs on a network of their own
§6 More reportsEnd of IR-2240