Six and a half acres of capped town landfill, covered in panels on ballast and a wildflower meadow sown by members — the co-op’s largest array, switched on in June 2023.


Piles or trenches would break the clay cap over the old tip, so the usual ground-mount frames were ruled out from day one.
Valley Electric Co-op crews set the frames on concrete ballast and ran cables in shallow trays above the cap. Volunteers sowed the meadow between the rows.
Larkfield makes 3,050 MWh a year — a credit on 980 member bills and 1,310 t of CO₂ avoided.
The old Larkfield tip was capped in the 1990s and fenced off ever since. Nothing could be built on it and nothing could be dug into it.
Members voted for it in 2021 over two greenfield sites. The Town of Hollis Valley leases it to the co-op for 25 years, and 20% of its shares were held back for renters.





One $50 share, refunded if you ever leave. No roof needed — renters and flat owners welcome, and the credit lands on the bill you already pay.