Larkfield Meadow Array

Larkfield Meadow, a Landfill That Pays Back.

Six and a half acres of capped town landfill, covered in panels on ballast and a wildflower meadow sown by members — the co-op’s largest array, switched on in June 2023.

Larkfield Road
Since 2023
 
Aerial view of a capped landfill hill covered with rows of solar panels beside a valley town
System
2.1 MWp
Ground-mount on concrete ballast — nothing pierces the landfill cap.
Volunteers in hi-vis vests planting flowers between rows of solar panels
Under the panels
Native wildflowers, sown and weeded by volunteers every autumn
01 / 03
The Story

Panels on Ballast, Meadow Below

01
Challenge

A Cap That Can’t Be Pierced

Piles or trenches would break the clay cap over the old tip, so the usual ground-mount frames were ruled out from day one.

02
Approach

Weight, Not Holes

Valley Electric Co-op crews set the frames on concrete ballast and ran cables in shallow trays above the cap. Volunteers sowed the meadow between the rows.

03
Result

The Valley’s Biggest Credit

Larkfield makes 3,050 MWh a year — a credit on 980 member bills and 1,310 t of CO₂ avoided.

980
Member homes share the credit
3,050 MWh
Generated in a typical year
6.5 acres
Of landfill put back to use
02 / 03
The Site

Town Land Nobody Could Use

The old Larkfield tip was capped in the 1990s and fenced off ever since. Nothing could be built on it and nothing could be dug into it.

Members voted for it in 2021 over two greenfield sites. The Town of Hollis Valley leases it to the co-op for 25 years, and 20% of its shares were held back for renters.

Ground-mount
Capped landfill
Meadow
Site sheet
Array 10 of 11
Location
Larkfield Road, Hollis Valley
Site
Capped municipal landfill, 6.5 acres
Host
Town of Hollis Valley (25-year lease)
System
2.1 MWp ground-mount on ballast
Members
980 member homes
Yield
3,050 MWh a year
Carbon avoided
1,310 t CO₂ a year
Under the panels
Native wildflower meadow
Built by
Valley Electric Co-op crews
Switched on
June 2023
Share
03 / 03
Gallery

Two Summers of Meadow

Aerial view of a village with a ground-mounted solar array in the fields beside it
Larkfield and the valley from the north ridge
Neighbours walking beside a community solar array at golden hour
Members on the first open day, June 2023
Volunteers washing ground-mounted solar panels with soft brushes
Spring panel wash with the volunteer crew
Weathered hands holding a seedling in soil above a solar panel
Seedlings for the meadow, grown by members
Members raising their hands to vote at a co-op meeting in a village hall
The 2021 vote that chose the landfill
More Arrays
Stone barn with a dark solar roof above raised vegetable beds
Previous
Millbrook Allotments Barn
180 kWp planned · $186,000 of $290,000 raised
Next
Hollis Commons Solar Garden
2.4 MWp · 410 households · 2019
Members walking through the long grass beside a community solar array
 
 
3,140 neighbours · one vote each

Own a Piece of the Valley's Sun.

One $50 share, refunded if you ever leave. No roof needed — renters and flat owners welcome, and the credit lands on the bill you already pay.

Visit the Grange Hall
14 Grange Street, Hollis Valley, CA 95400