Ground-mounted solar rows below the vines at Calder Ridge
Ground-mounted solar rows below the vines at Calder Ridge

Calder Ridge
Winery

A hillside winery whose cellar cooling peaks on the hottest afternoons — the same hours the ground-mounted rows below the vines produce the most.

Commercial
Calder Ridge, CA
Completed September 2025
Payback
 
 
5.9yrs

on the full install price. Cellar cooling and sunshine peak in the same hours, so almost nothing is exported.

Spec sheet

The system, line by line.

Figures from the winery’s monitoring portal and a full year of utility statements, checked with Luca Ferrante after the 2026 harvest.

System size
180kWp
Panels
410 × 440W
Yield, year one
268MWh
CO₂ avoided
113t a year
Payback
5.9years
Location
Calder Ridge, CA
Completed
September 2025
Installed by
Crews 2 + 6· 3 weeks
The story

The hottest hour of the year, covered.

Luca Ferrante ferments and ages in a cellar cut into the hill. On a 105 °F harvest afternoon the chillers ran flat out on the dearest power of the day.

Cellar held at 55 °F
Barn roof + slope rows
01
Challenge
The barrel-barn roof could carry only a third of what the cellar needed, and the cellar itself is cut into the hill. Summer bills reached $9,000; the only other open land was a south slope below the vines, on clay that cracks in drought.
02
Solution
130 panels on the barrel-barn roof and 280 on driven piles in rows that follow the slope, two 90 kW inverters by the press house and a trench to the cellar chillers. Sheep graze under the ground rows instead of mowers.
03
Result
Year one gave 268 MWh. The average bill fell from $6,900 to $1,650, the chillers ran on the slope through every harvest afternoon, and payback is on track for 5.9 years.
 

Monthly power bill, before and after

−76% a month
Before
 
$6.9k
After
 
 
$1.7k
Bills after solar · Oct 2025 – Sep 2026
Winter months in rose
$1.9k
 
O
$2.1k
 
N
$2.6k
 
D
$2.4k
 
J
$2k
 
F
$1.5k
 
M
$1.2k
 
A
$960
 
M
$850
 
J
$930
 
J
$1.5k
 
A
$1.9k
 
S
Where the power goes
96%
of the output used on site, not exported
55°F
cellar held through a 105 °F harvest
24sheep
keeping the grass down under the slope rows
On site

Three weeks, done before harvest.

Piles and rails in week one, panels on the barn roof and down the slope in week two, the trench to the cellar and switch-on in week three — days before the first grapes came in.

Week 2 · rows down the south slope
Thermal check on the cellar chillers
Week 1 · kit unloaded at the press house
 
“On the hottest harvest afternoon the chillers ran on the slope while the meter barely moved. I never thought I’d enjoy a heatwave.”
Portrait of Luca Ferrante
Luca Ferrante
Winemaker, Calder Ridge · 180 kWp
Open vineyard

Winery, farm or estate?

Luca walks visitors along the rows and into the cellar plant room. We set up the visit — tasting optional.

Cs 6
Previous project
Linden Court Apartments
Residential · 72 kWp + 120 kWh
Next project
Sunvale Community Solar Garden
Community · 2.4 MWp
Cs 8
 
 
 
 
 
 
 
Free estimate · about 30 seconds

Get your own number.

Send a photo of one power bill. Within a working day you get a system size, a fixed price and the month it pays for itself.

Rather talk?

Talk to a system designer, not a call centre.

+1-555-0142
Mon–Sat · 8:00–18:00
[email protected]
Answered the same working day