Most quotes start with a panel count. Ours start with your bills. We map the roof from satellite data, confirm it on site, model the shade hour by hour and size the system to the power you actually use — with room for a battery or an EV later.
Then one crew of Helioro employees fits it in a day or two, and the same team answers the phone for the next decade.

One fixed price covers all eight. If we find something on the roof that changes it, you hear before we start — not on the invoice.
Tidy conduit, no visible rails, the inverter on a wall you choose. Same crew, same standard on slate, clay tile or standing-seam metal.



A family ranch, a 48-flat block and a primary school — each with the yield we promised and the yield it made.



The five questions we hear on almost every roof survey.
Most homes are finished in one or two days on the roof. Before that, permits and utility approval take two to four weeks — we file both and text you at every step.
Almost always. We fit asphalt shingle, clay and concrete tile, slate and standing-seam metal. The survey checks the rafters and the roof’s age first, and if it needs work soon you hear that before you sign.
Panels still produce under cloud, just less. At night the house draws from the grid as usual — or from a battery if you add one — and net metering credits the surplus you exported during the day.
No. Most homes start with panels only and add a battery later. We size the inverter and panel board on day one, so a battery wires in without ripping anything out.
An owned system usually adds to the sale price, and the panel warranty, monitoring and our 10-year workmanship cover move to the new owner. A loan can be paid off at closing.