Westbrook Primary School with solar on its flat roofs
Westbrook Primary School with solar on its flat roofs
Case Studies›Westbrook

Westbrook
Primary School

Fitted across two school holidays without closing a single classroom. 420 pupils now read last week’s output aloud in Monday assembly.

Community
Westbrook, CA
Completed August 2024
Payback
 
 
7.4yrs

on the installed cost, paid from the district’s capital fund. The bill savings stay in the school’s own budget.

Spec sheet

The system, line by line.

Figures from the lobby screen’s monitoring feed and two years of utility statements, checked with Theo Lindqvist in September 2026.

System size
140kWp
Panels
318 × 440W
Annual yield
164MWh
CO₂ avoided
61t a year
Payback
7.4years
Location
Westbrook, CA
Completed
August 2024
Installed by
Crews 1 + 2· 2 holidays
The story

Two holidays. Not one lost lesson.

The district wanted panels on the hall and both classroom wings, but would not close a classroom for it. Theo Lindqvist gave us two windows: Easter and the summer break.

420 pupils
3 roofs · 1 meter
01
Challenge
Three flat roofs of different ages, a 1990s hall with little spare load capacity and no crane access while children were on site. Summer bills ran near $6,000 with the afternoon air-conditioning on.
02
Solution
Ballasted rows on the classroom wings over Easter, a lightweight rail system on the hall in the summer break, the inverters in the old boiler room and a lobby screen showing live output.
03
Result
Two full years in, the roofs give 164 MWh a year. The average bill fell from $4,650 to $1,540 and the savings now pay for a teaching assistant. Payback is on course for 7.4 years.
 

Monthly power bill, before and after

−67% a month
Before
 
$4.7k
After
 
 
$1.5k
Bills after solar · Sep 2024 – Aug 2025
Winter months in rose
$1.3k
 
S
$1.6k
 
O
$2.2k
 
N
$2.8k
 
D
$2.6k
 
J
$2.2k
 
F
$1.7k
 
M
$1.3k
 
A
$1k
 
M
$730
 
J
$450
 
J
$620
 
A
Where the power goes
3,150kWh
in a typical week, read out on Mondays
92%
of school-day power from the roof, April to October
$37k
a year back in the school’s own budget
On site

Easter for the wings. Summer for the hall.

Panels craned onto the classroom wings over the Easter break; the hall roof, inverters and lobby screen in the summer holiday. Pupils never shared the site with a crew.

Easter · panels craned onto the wings
Survey day with the facilities lead
Summer · sign-off with the governors
 
“They fitted 140 kWp across two school holidays and never needed a single classroom. On Mondays the kids read last week’s output out in assembly.”
Portrait of Theo Lindqvist
Theo Lindqvist
Facilities Lead, Westbrook Primary · 140 kWp
Open roof

Run a school or a district?

Theo shows other facilities leads the roofs, the inverter room and the assembly screen. We set up the visit.

Cs 2
Previous project
Marlow Orchard Barn
Commercial · 96 kWp
Next project
Harbor Logistics Warehouse
Commercial · 1.2 MWp
Cs 4
 
 
 
 
 
 
 
Free estimate · about 30 seconds

Get your own number.

Send a photo of one power bill. Within a working day you get a system size, a fixed price and the month it pays for itself.

Rather talk?

Talk to a system designer, not a call centre.

+1-555-0142
Mon–Sat · 8:00–18:00
[email protected]
Answered the same working day