Marlow Orchard barn with rooftop solar above the cold store
Marlow Orchard barn with rooftop solar above the cold store

Marlow
Orchard Barn

A working apple barn whose cold store ran on the dearest afternoon power of the year. The barn roof now carries the cooling through harvest.

Commercial
Marlow, CA
Completed June 2025
Payback
 
 
5.8yrs

on the full install price — tracked against the farm’s utility statements since switch-on in June 2025.

Spec sheet

The system, line by line.

Figures from the farm’s monitoring portal and utility statements, checked with Graham Pell in September 2026, after a second harvest on the roof.

System size
96kWp
Panels
218 × 440W
Yield, year one
112MWh
CO₂ avoided
47t a year
Payback
5.8years
Location
Marlow, CA
Completed
June 2025
Installed by
Crews 1 + 3· 9 days
The story

A cold store that peaked with the sun.

Graham Pell’s barn chills 400 bins of apples from August to November. The compressors ran hardest on hot afternoons — exactly when the utility charges most.

400-bin cold store
Peak rate 4–9 pm
01
Challenge
A 1960s timber barn, a cold store drawing 38 kW at peak and summer bills near $4,000. Our surveyor found a cracked purlin over the packing bay before anyone climbed the ladder.
02
Solution
The purlin was sistered first. Then 218 panels in eleven strings on the south and west slopes, two 50 kW inverters and a controller that pre-cools the store at midday so the compressors idle through the 4–9 pm peak.
03
Result
Year one produced 112 MWh. The average bill fell from $3,180 to $890, the cold store runs on the roof from June to October and spring surplus is exported. Payback is on track for 5.8 years.
 

Monthly power bill, before and after

−72% a month
Before
 
$3.2k
After
 
 
$890
Bills after solar · Jul 2025 – Jun 2026
Winter months in rose
$480
 
J
$870
 
A
$1.1k
 
S
$1.1k
 
O
$1.1k
 
N
$1.4k
 
D
$1.2k
 
J
$1k
 
F
$800
 
M
$630
 
A
$500
 
M
$440
 
J
Where the power goes
83%
of the summer cooling load met by the roof
31MWh
exported in spring, before the harvest
9days
on site, with the packing line running
On site

Nine days, packing line running.

A drone survey and the purlin repair first, rails and panels in week one, inverters beside the cold store in week two — the packing line never stopped.

Week 1 · rails and ballast on the barn
Week 2 · inverters by the cold store
Survey day · drone over the roof
 
“Their surveyor found a cracked purlin before anyone went up the ladder. The cold store has run on the barn roof every summer since.”
Portrait of Graham Pell
Graham Pell
Owner, Marlow Orchard · 96 kWp
Open barn

Farm or packhouse with a big roof?

Graham walks other growers round the barn roof and the cold-store controls. We set up the visit.

Cs 1
Previous project
Hillcrest Family Home
Residential · 8.4 kWp
Next project
Westbrook Primary School
Community · 140 kWp
Cs 3
 
 
 
 
 
 
 
Free estimate · about 30 seconds

Get your own number.

Send a photo of one power bill. Within a working day you get a system size, a fixed price and the month it pays for itself.

Rather talk?

Talk to a system designer, not a call centre.

+1-555-0142
Mon–Sat · 8:00–18:00
[email protected]
Answered the same working day