What we hear on driveways from Fairmont to Alder Grove — answered by the designers and electricians who do the work.
Can’t find your question? Ask by phone or email — a designer or electrician answers, not a call centre.
Most Alder Valley homes save $1,250–$3,180 in year one, depending on the bill; our 2025 installs averaged $2,060. A $210 monthly bill with a 7.6 kW system saves about $2,040. Your proposal uses your own twelve months of bills, not an average.
Most homes land between $11,000 and $24,000 before incentives. The quick quote on our home page gets you within 10%; the 45-minute survey gets you the exact, fixed figure in writing.
Typically 6–8 years on a cash purchase. Bigger bills pay back faster — our 4-bed, pool and two-EV example breaks even in 6.3 years, the 2-bed bungalow in 7.9. After that the savings are yours for the rest of the 25-year panel warranty.
Cash keeps the most over 25 years. A 5.99% APR solar loan gets you ownership with $0 down and is what most of our customers choose; a lease or PPA at a fixed 17.9¢/kWh means no upfront cost and we maintain the system. Every proposal prices all three side by side.
One or two days on the roof for most homes. First call to switch-on is about five weeks: survey in week one, design and fixed price by week two, permits and utility approval in weeks two to four, install in week five.
No. Every mount is screwed into a rafter and sealed under a metal flashing, and our 12-year workmanship warranty covers each penetration. On clay or concrete tile we lift the tiles, fit hooks and replace any cracked tile from matched stock.
Only at the start and the end: we walk through the plan in the morning and show you the app at switch-on. Crews are Brightpath employees — 34 people, all on payroll, no subcontractors.
We do. Gary Holcomb files the permit and the utility interconnection application, and both are inside the fixed price. Approval usually takes two to four weeks; you only sign twice.
Without a battery, grid-tied panels switch off for the line crews’ safety. With one, your backed-up circuits — usually fridge, lights, Wi-Fi and a few outlets — switch over in under 20 ms, and the panels refill the battery every sunny morning.
No. If you mostly want lower bills, start with panels. We wire every install battery-ready, so adding storage later takes a day and no new permit work on the roof.
Ours run from 10 to 30 kWh. One 13.5 kWh unit carries a typical backed-up list for a day or more; Priya Raman sizes it from the circuits you want covered, not the biggest box that fits the wall.
Usually, yes — even to panels we didn’t install. We check the inverter first; most systems take an AC-coupled battery, priced in your quote before any work starts.


No ticket queue. Your question goes to a designer or electrician in Fairmont, and the answer comes back in writing — the same working day.
Every figure here is the one we print on your proposal — measured on our own installs, no asterisks.