Installer arriving at a ranch house on install morning
Installer arriving at a ranch house on install morning
How It Works

From first call
to switch-on.

Five steps and one project lead from first call to switch-on — with a week next to every step before you sign anything.

5 steps
One project lead
Updated for 2026 permits
Typical timeline
5weeks
between your first call and switch-on, and most of that is permits and approvals we chase for you; the crew is on your roof for one or two days.
01
02
03
04
05
Before & after

What we ask of you, and what you get back.

Six simple items take us from survey to a fixed price by the end of week two. Once the panels are on, the app puts every figure we quoted in your hand.

What you’ll need

Short of one? We can still begin.
A recent power bill
A photo or PDF is fine; a full year of bills is better still.
Roof or attic access
So the designer can inspect rafters and wiring in 45 minutes.
A picture of your breaker panel
Shows whether an upgrade is needed before we price the job.
Any HOA rules that apply
We write and send the approval request ourselves.
Your Wi-Fi name
So the monitoring gateway connects on day one.
Room to park on install day
Our van and materials need a spot close to the house.
Homeowner on her sofa checking the day's solar savings on her phone
iOS & Android
What you’ll get

See your system live on your phone.

Output from the roof, use in the house, charge in the battery, and a flag from us if anything looks off before you would notice.

+$6.12 saved today
against the grid rate · 4:12 pm
Battery charged by 2:40 pm
Evening powered until 11 pm
Spring check booked
Thu, Mar 12 · 9–11 am visit
Installers fitting panels on a shingle roof
Installers fitting panels on a shingle roof
A typical install day
Day one of 1–2

One install day, hour by hour.

We open with a safety brief at 7:30, fix rails and panels through the day, and switch on with you before we leave.

Crew of three
7:30 am – 3:30 pm
7.6 kW · 19 panels
One fixed price, in writing
The number on your proposal is the number on the invoice.
A message before each visit
Who is coming, with a photo and an arrival window.
If a date moves, you hear it first
Straight from your project lead, with the new date attached.
The journey

Five steps, every one with a date and a person.

One project lead sees you through from start to finish, books each step and sends a short text when it is complete. Below is our part, and the small part that is yours.

Designer pointing at a roof with a homeowner during a home survey
Step 01
Week 1 · about 45 min

Free home survey

A designer checks your roof, shade, rafters and panel board — on site, within five days of your first call.

Shade mapped through the day
A year of bills read in detail
Your part
Send one recent power bill, as a photo.
≈ 2 minutes
Your part
Choose panels alone, add a battery, or take both.
One 20-minute call
Solar designer drawing a panel layout on a large monitor
Step 02
Week 1–2

Design & fixed price

One panel layout, an optional battery or charger and a single fixed price — with the year it pays for itself.

Cash, loan and lease laid out together
No pressure follow-up calls
Step 03
Week 2–4

Permits, done by us

We file the city permit and the utility approval, then chase both until they land. You sign twice; we do the rest.

A text at each milestone
Nothing is charged until approvals arrive
Your part
You sign two forms; we file the rest.
E-signature, ≈ 5 minutes
Your part
Leave the driveway free on install day.
We bring everything else
Step 04
Week 5 · 1–2 days

Install by our own crew

Brightpath employees, never subcontractors. Tidy conduit, flashed mounts, roof seals checked twice.

Your crew lead shows you around first
We leave the site tidier than we found it
Step 05
Day one, then 12 years

Switch-on & care

The inspector signs off, we switch on with you and set up the app. Then we watch every panel — 12-year workmanship.

Every panel reports every 15 minutes
A dip in output gets you a call from us
Your part
Install the app and we’ll guide you through it.
≈ 10 minutes
 
 
 
 
 
 
 
Free home survey · within 5 days

Get one number for your roof.

Book the 45-minute survey. Within a week you get a panel layout, one fixed price and the week your roof switches on.

Rather talk?

Talk to a designer, not a salesperson.

+1-⁠555-⁠0177
Mon–Sat · 8:00–⁠18:00
[email protected]
Answered the same working day