

Five steps and one project lead from first call to switch-on — with a week next to every step before you sign anything.
Six simple items take us from survey to a fixed price by the end of week two. Once the panels are on, the app puts every figure we quoted in your hand.

Output from the roof, use in the house, charge in the battery, and a flag from us if anything looks off before you would notice.


We open with a safety brief at 7:30, fix rails and panels through the day, and switch on with you before we leave.
One project lead sees you through from start to finish, books each step and sends a short text when it is complete. Below is our part, and the small part that is yours.

A designer checks your roof, shade, rafters and panel board — on site, within five days of your first call.

One panel layout, an optional battery or charger and a single fixed price — with the year it pays for itself.
We file the city permit and the utility approval, then chase both until they land. You sign twice; we do the rest.
Brightpath employees, never subcontractors. Tidy conduit, flashed mounts, roof seals checked twice.
The inspector signs off, we switch on with you and set up the app. Then we watch every panel — 12-year workmanship.