A four-storey block of 24 apartments that now runs its lifts, hallway lights and shared EV bays on its own roof — with a 120 kWh battery for the evening peak.

Residential + Battery
Westfield, CA
Completed March 2026
Common-area bill
 
 
−77%

a month — $14,800 a year saved on lifts, hallways, lighting and six shared EV bays.

Spec sheet

The system, line by line.

Every figure comes from the owner’s statements and the monitoring app, checked with them in October 2026.

System size
72kWp rooftop
Storage
120kWh shared
Building
4 storeys24 apartments
Covers
Common areas+ EV bays
Monthly bill
$0.4kwas $1.6k
Saved a year
$14,800
On site
9days
Completed
March 2026
 

Common-area power bill, before and after

−77% a month
Before
 
$1.6k
After
 
 
$370
Bills in the 12 months before solar · association statements
Summer months in blue
$1.3k
 
J
$1.2k
 
F
$1.2k
 
M
$1.3k
 
A
$1.5k
 
M
$1.8k
 
J
$2.2k
 
J
$2.2k
 
A
$2k
 
S
$1.5k
 
O
$1.4k
 
N
$1.6k
 
D
Where the power goes
120kWh
of shared storage for the evening peak
6bays
of resident EV charging
9days
on site, tenants at home throughout
The story

Tenants at home, crews on the roof.

Hal Brenner chairs the owners’ association. The board wanted lower service charges and car charging for residents — without a month of scaffolding.

24 apartments
6 shared EV bays
01
Challenge
A flat roof shared with plant equipment, a common-area bill near $1,600 a month and residents asking for EV charging the old supply could not carry.
02
Solution
A 72 kWp ballasted array between the plant, a 120 kWh battery cabinet for the evening peak and six shared EV bays on a solar-first schedule — fitted in nine days.
03
Result
The common-area bill fell to about $370 a month. The association saves $14,800 a year, and residents charge in the bays every evening.
 
“The board had one question: what happens to the service charge. Brightpath answered it on one page, and the answer turned out to be right.”
HB
Hal Brenner
Board chair, Linden Court owners’ association
Site visit

Run a building like this?

Hal walks other boards through the roof, the battery cabinet and the numbers. We set up the visit.

On site

Nine days, flat by flat.

Ballast and rails first, panels in rows between the plant, then the battery cabinet and the EV bays. Hallway lights never went off.

Rooftop rows and the shared battery cabinet
Switch-on with the building manager
Yearly check at the inverter
Brick ranch home with an all-black solar roof
Previous project
Hillcrest Family Home
Residential · 8.4 kWp
Next project
Calder Ridge Winery
Commercial · 180 kWp
Winery barn with a solar roof among vineyards
 
 
 
 
 
 
 
Free home survey · within 5 days

Want a spec sheet like this one?

A 45-minute survey, a panel layout and one fixed price in writing — usually within a week.

Rather talk to a person?

Talk to a designer, not a salesperson.

+1-⁠555-⁠0177
Mon–Sat · 8:00–⁠18:00
[email protected]
Answered the same working day