Harbor Logistics warehouse roof covered in solar panels
Harbor Logistics warehouse roof covered in solar panels

Harbor Logistics
Warehouse

A distribution warehouse with a vast flat roof and a truck yard. Ballasted rows up top and a carport over staff parking now cover most of the daytime load.

Commercial
Harbor Point, CA
Completed November 2025
Payback
 
 
6.1yrs

on the full project cost, roof and carport together — tracked against the site’s utility statements since November 2025.

Spec sheet

The system, line by line.

Figures from the site’s monitoring portal and eleven months of utility statements, checked with Marcus Hale in October 2026.

System size
1.2MWp
Panels
2,180 × 550W
Annual yield
1,690MWh
CO₂ avoided
712t a year
Payback
6.1years
Location
Harbor Point, CA
Completed
November 2025
Installed by
Crews 1, 3 + 5· 7 weeks
The story

Plenty of roof. Not much spare load.

Harbor Logistics runs refrigerated docks and 60 forklift chargers from 5 am. Marcus Hale wanted the daytime load off the grid without losing a single shift.

2 shifts · 6 days
60 forklift chargers
01
Challenge
A 1990s steel roof rated for light ballast only, a yard that never stops moving and a monthly bill above $41,000 — most of it daytime demand from the docks and the forklift chargers.
02
Solution
A low-ballast system for 1,820 panels on the roof, a three-row carport with 360 more over staff parking, and the work phased bay by bay over seven weeks so the docks below kept running.
03
Result
The site now averages $12,900 a month, down from $41,200. The forklifts charge at midday on rooftop power, the carport shades 120 staff cars and payback is on track for 6.1 years.
 

Monthly power bill, before and after

−69% a month
Before
 
$41.2k
After
 
 
$12.9k
Bills after solar · Dec 2025 – Nov 2026 · Nov modelled
Winter months in rose
$22.1k
 
D
$20.2k
 
J
$16.9k
 
F
$13k
 
M
$10.2k
 
A
$8.1k
 
M
$7.2k
 
J
$7.8k
 
J
$8.9k
 
A
$10.4k
 
S
$12.4k
 
O
$17.6k
 
N
Where the power goes
74%
of the site’s daytime load met by the arrays
120bays
shaded by the staff carport
0shifts
lost in seven weeks of work overhead
On site

Seven weeks, bay by bay.

The roof went in one loading bay at a time so the docks below kept working; the carport rows followed at weekends, one row at a time.

Week 5 · roof rows from the air
Commissioning · string by string
Staff carport · 360 panels
 
“Seven weeks of work on the roof over our heads and we never lost a shift. The forklifts now charge at lunchtime on our own power.”
Portrait of Marcus Hale
Marcus Hale
Operations Director, Harbor Logistics · 1.2 MWp
Site tour

Running a warehouse or a fleet?

Marcus hosts other operations teams on the roof walkway and in the charger bay. We set up the visit.

Cs 3
Previous project
Westbrook Primary School
Community · 140 kWp
Next project
Civic Center Solar Canopy
Commercial · 310 kWp
Cs 5
 
 
 
 
 
 
 
Free estimate · about 30 seconds

Get your own number.

Send a photo of one power bill. Within a working day you get a system size, a fixed price and the month it pays for itself.

Rather talk?

Talk to a system designer, not a call centre.

+1-555-0142
Mon–Sat · 8:00–18:00
[email protected]
Answered the same working day