Permits and Utility Approval, Step by Step

•1 min read
Why weeks two to four are mostly paperwork — and why you only sign twice.
Single-storey home with a solar roof and a service van in the drive

Between design and install there are two approvals: the city building permit and the utility’s interconnection agreement. Both are our job.

The city permit

We submit stamped drawings, a structural letter if the roof needs one, and the electrical single-line diagram. Fairmont usually turns these around in about a week; neighbouring towns can take two.

The utility agreement

The utility reviews the system size and signs off on net metering. You sign the application once, we track it and answer every question they send.

Inspection and permission to operate

After install, the city inspects the work and the utility swaps or reprograms your meter. Then we switch the system on with you and set up the monitoring app together.

From first call to switch-on, that whole sequence takes about five weeks for most homes.

Written By

Solar Designer
Solar designer at Brightpath and NABCEP-certified. Mei turns twelve months of bills into one system size and one payback number, and writes most of our journal from the questions customers ask on survey day.
All articles by Mei Lin
Keep reading

More from the Brightpath crew.

All Articles
Free home survey

Get one number for your roof.

A 45-minute survey, a panel layout and one fixed price — usually within a week.

Book My Free Survey
Rather talk?

Talk to a designer, not a salesperson.

+1-555-0177 · Mon–Sat 8–18[email protected]