Between design and install there are two approvals: the city building permit and the utility’s interconnection agreement. Both are our job.
The city permit
We submit stamped drawings, a structural letter if the roof needs one, and the electrical single-line diagram. Fairmont usually turns these around in about a week; neighbouring towns can take two.
The utility agreement
The utility reviews the system size and signs off on net metering. You sign the application once, we track it and answer every question they send.
Inspection and permission to operate
After install, the city inspects the work and the utility swaps or reprograms your meter. Then we switch the system on with you and set up the monitoring app together.
From first call to switch-on, that whole sequence takes about five weeks for most homes.