Architects, slaters, metalworkers and electrical engineers who sit at the same table every morning — and stand on the same scaffold every week.

Marta still leads the roof-plane study on every commission and signs the last drawing before a scaffold goes up.

Twenty-two years in residential practice, ten of them designing stone houses on the coast before she opened Aurelle in a converted olive mill. She teaches a roof-detailing module at the regional school of architecture every spring.
Roof geometryPlanningFounded 2012
Leads the roof-plane study on every commission and signs the last drawing before a scaffold goes up.
Roof geometryPlanningJoined 2014
Draws every roof plane in the client architect’s own model, then walks it with the slaters before a tile is ordered.
SlateSite safetyJoined 2013
Runs both site crews and the scaffold programme. Nothing is signed off until she has stood on it in the rain.
BronzeHeritageJoined 2012
Forty years on roofs, the last twelve with us. Folds the bronze on site and trains every apprentice we take on.
BudgetsHandoverJoined 2017
Your one phone number from the first call to the last care visit. Holds the budget, the programme and the handover pack.
InvertersCanopiesJoined 2018
Designs every string, inverter room and cable route — and makes sure none of them can be seen from the lane.
Fourteen names, no agency staff. Whoever measures your roof will be on the scaffold when it goes on.

Four small rules, older than the solar slate, that stop a drawing and a roof from drifting apart.


When we do, it’s for a long time. Two roles are open now — one at the drawing board, one on the roof.
Bring the drawings to a 90-minute session — at the studio, on site or by video. You leave with a roof-plane sketch and a fixed fee.