Four stages that slot into your architect’s programme. Each one ends with a fixed deliverable and your sign-off before we move on.

A typical new-build with solar slate and hidden storage. Heritage projects add two to four weeks for consent; canopies often finish in eight.
We model every roof plane against the sun, the trees and the neighbours, then lay out live and blank tiles so you see output and appearance side by side.
Tile setting-out, trims, cable routes and the battery niche, drawn to your architect’s standards and checked against the structure.

We prepare visuals and the design statement, meet the officer if needed, and file the grid connection — all while detail design continues.
Our own slaters, metalworkers and electricians, with one site lead from scaffold to switch-on. Then a handover walk and a pack you’ll actually read.
Issued to your standards and layer conventions. We sit in your design team meetings from concept to completion.
We can start at any stage before the roof goes on. Here is what each one leaves open.
Roof pitch, orientation and the plant room are still moving. We can shape them for yield without changing the look you want.
We work within the approved envelope. Finishes and layout are free; small amendments may need a non-material change.
Before the roof goes on, solar slate is still a straight swap. Storage may need a cupboard rather than a drawn niche.
Programme questions from owners and the practices we work with.
No. Your architect keeps the design lead. We work inside their model and programme and take the roof, storage and grid off their desk.
It is a fixed fee, agreed in writing before the site visit and credited against the build if you go ahead. You keep the yield overlays and the study summary either way.
It can move the start, not the length of the build. Planning runs in parallel with detail design, and the sample panel and visuals go to the officer before the application, so a decision rarely holds up weeks eight to twelve.
Our own slaters, metalworkers and electricians — never subcontractors — under one site lead who stays from scaffold to switch-on and walks you through the handover.
Bring the drawings to a 90-minute session — at the studio, on site or by video. You leave with a roof-plane sketch and a fixed fee.