Install Day, Hour by Hour

From the van arriving at eight to the first app reading before dinner.
Vesper electrician installing a home battery in a garage

Most Vesper installs take one day and one crew of licensed electricians — never subcontractors. Here is what that day looks like.

08:00 — arrival and walk-through

The crew lead walks the house with you, confirms the cabinet spot marked on the survey and lays dust sheets from the door to the panel.

09:00 — the power goes off, briefly

We switch the house off at the main for about three hours to fit the gateway beside your meter. Fridges stay closed and happy; we tell you exactly when it will come back.

10:00–12:00 — cabinet and conduit

The wall bracket goes up, the cabinet is lifted on and a single conduit runs to the gateway. If you have solar, the inverter is connected now.

12:30 — power back on

The house runs normally again while the crew tests every circuit on the essentials panel.

14:00 — commissioning

We update the firmware, set your rate plan and run a live backup test: the crew opens the main breaker and you watch the house carry on.

16:00 — handover

The app goes on your phone, the paperwork goes in a folder, and the crew sweeps up. The first app reading usually arrives before dinner — and twelve months later, so does your year-one report.

Written By

Head of Battery Design
Head of Battery Design. Nine years at Vesper, and she still reads a year of meter data before naming any size.
More From Maya Lindgren
Keep reading

Three More Notes After Dark

All Notes
Free Sizing · Two Minutes

Keep Tonight’s Lights On.

Send a recent bill. We’ll come back with the right size, a fixed installed price and the evening savings — in writing, by tomorrow.

Size My Battery
Rather Talk It Through?

Speak to a designer, not a script.

Outage line 24/7 · +1-555-0187[email protected]Replies within a working day