Harbor Street Café

Harbor Street Café, Still Pouring.

Our neighbours three doors down. Two cabinets keep the espresso machines, fridges and till running when the street goes dark, and the café's afternoon peak now comes from the roof.

Harbor Street, Calder Bay
Live since Nov 2025
 
Year-One Report
Metered
$2,310

Saved in the first twelve months, $260 more than the written estimate.

 
 
 
 
 
 
 
 
 
 
 
Owner Story · Small Business
 
11 kWp · 27 kWh · critical loads
01The Café
 
Installed Nov 2025

Forty Covers and an Afternoon Peak

What the café had, what we fitted and what the meter said twelve months later.

01

The Problem

Forty covers, two espresso machines, three fridges and a till, on a street that had lost power twice the winter before. Every outage meant pouring coffee down the sink and turning people away.
02

What We Fitted

Two 13.5 kWh cabinets, 27 kWh in all, in the back store, an 11 kWp roof and a critical-loads panel for the machines, fridges and till. Fitted overnight, between closing and the breakfast rush.
03

What Changed

Two outages carried without closing, one of them mid-service on a Saturday night. The afternoon peak now runs on the roof, and the year's bills fell by $2,310 against a $2,050 estimate.
 
Spec Sheet
Project 2025-131
Owner
Harbor Street Café
Location
Harbor Street, Calder Bay
Site
Café, 40 covers
Solar
11 kWp
Battery
2 × 13.5 kWh Whole Home
Critical loads
Espresso machines, fridges, till
Installed
Nov 2025 · overnight
Payback
7.9 yrs
PDF · 1 page · shared with the café's permission
02Outage Log
 
2 outages · no covers lost

Two Outages. Not One Cold Coffee.

Both outages of the year: Valentine's night mid-service, and a planned transformer swap over a Thursday lunch.

Date
Duration
Charge
Inside
14 Feb 2026
The February storm
8 h 25 m
92% → 61%
Service ran on
21 May 2026
Transformer swap on the street
3 h 40 m
100% → 47%
Lunch ran on
17 ms
12 h 05
47%
Slowest switch-over
Off-grid in year one
Lowest charge reached
Storm Night
14 Feb 2026
19:42
Grid fails along Harbor Street
+17 ms
Battery takes over at 92%
19:45
Valentine's service carries on · 36 covers
21:30
Last coffees out · 74%
22:10
Closed up: fridges, freezer and alarm only
04:07
Grid back · battery at 61%
Charge through the night
92% → 61%
 
 
 
 
 
 
 
 
03The Bills
 
Nov 2024 → Oct 2026

The Café Bill, Before and After

Twelve months before the cabinets against the twelve after. Before local incentives.

Monthly bill, USD
 
Year before · avg $488
 
Year one · avg $296
$0
$200
$400
$600
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Deepest drop from April to August, when the roof covers the afternoon trade and refills both cabinets
Year before
$5,860
Grid import 16,280 kWh
Year one
$3,550
Grid import 8,450 kWh
Saved
$2,310
Estimate was $2,050 · +12.7%
04Gallery
 
Photos · Harbor Street

Around the Café

Customers never see it: two cabinets in the back store and a panel beside the main board.

Vesper electrician installing a home battery in a garage
Install night · gateway beside the main board, 23:40
Two white Vesper home battery units on a garage wall
Two white Vesper home battery units on a garage wall
The back store · two cabinets, one battery
Close-up of a home battery status light
Close-up of a home battery status light
The status light · peach on Valentine's night
05In Their Words

Valentine's Night, Still Lit

Rosa Delgado, owner, on the February storm, three months after switch-on.

The whole street went black at twenty to eight and we were the only lit window on Harbor Street. People came in from the restaurants next door. We kept pouring until half nine, then closed up as usual. The fridges never noticed.

Portrait of Rosa Delgado
Rosa Delgado
Owner, Harbor Street Café · 27 kWh
8 h 25 m off-grid
2 espresso machines on
Home battery and inverter in a tidy utility room
Previous Story
Linden Mews Townhouse
Next Story
Pell Ridge Farmhouse
Vesper electrician installing a home battery in a garage
 
Free Sizing · Two Minutes

Keep Tonight's Lights On.

Send a recent bill. We'll come back with the right size, a fixed installed price and the evening savings — in writing, by tomorrow.

10-yr warranty
 
< 20 ms backup · 1-day install
 
Rather Talk It Through?

Speak to a designer, not a script.

+1-555-0187
Outage line 24/7
[email protected]
Replies within a working day
418 Harbor Street
Showroom · Calder Bay, CA 94000
Mon–Sat 8:00–19:00
Walk in, no appointment