Plant line, 24/7 +1-555-0164[email protected]
§1 How we workOnboarding record / Sample plant
No shutdown to get started and no agent on a controller. You always know who is on your floor, what they did last, and which window comes next.
§2 First 30 daysPlan for a sample plant
Each line has an owner on our side. The right column shows what it takes from yours. None of it stops a line.
§3 Engagement steps6 steps, walk to steady

Site lead | Named, at every window |
Engineer | Fits the sensor |
On shift | Engineers, day and night |
Half a day on foot with your controls lead. Nothing gets connected.
You get: a one-page view
Two pages: the zones we listen to, the ones we leave alone, and the price.
You get: scope letter
One mirror port, under two hours, with no outage.
You get: coverage note
The asset list builds itself. We draw the zones with your team.
You get: asset list, zone map
Every task, its hours, its rollback and the name that signs.
You get: signed outage plan
One hour with your site lead on the report and the next three jobs.
You get: monthly site report
§4 Deliverables7 documents
If you leave, they stay on your site. Another provider, or your own team, could pick up from them on day one.

Document | Arrives | Length | Written for |
Site walk note | Day 1 | 1 page | Plant manager |
Scope letter | Day 2 | 2 pages | Plant manager, controls lead |
Asset list | Day 18, then kept current | Running list | Controls lead |
Zone and conduit map | Day 26 | 1 drawing | Controls lead, site safety lead |
Outage plan | Before each window | 1 page | Plant manager, who signs it |
Rollback sheet | Each window | 1 page, taped in the cabinet | Night shift operator |
Monthly site report | Each month | 6 to 8 pages | Plant manager |
§5 Next stepStep 1 of 6