§1 How we workOnboarding record / Sample plant

From the site walk to the monthly report

Nothing movesuntil it issigned.

Your controls lead's time, first 30 days
9 hr
Logged at a two site food plant

No shutdown to get started and no agent on a controller. You always know who is on your floor, what they did last, and which window comes next.

§2 First 30 daysPlan for a sample plant

The first 30 days, line by line.

Each line has an owner on our side. The right column shows what it takes from yours. None of it stops a line.

Work
Day 1
Day 10
Day 20
Day 30
Your time
Site walk, on foot
4 hr
Sensor on a mirror port
30 min
Listen, build the asset list
None
Asset list review
2 hr
Zone map draft
1 hr
First outage plan, signed
30 min
First site report review
1 hr
Total, your controls lead
9 hr

§3 Engagement steps6 steps, walk to steady

Technician wiring a network cabinet in a site back room full of parts
Who you will see on site

Site lead

Named, at every window

Engineer

Fits the sensor

On shift

Engineers, day and night

Six steps, and you can stop after either of the first two.

Day 1
Site walk

Half a day on foot with your controls lead. Nothing gets connected.

You get: a one-page view

Day 2
Scope letter

Two pages: the zones we listen to, the ones we leave alone, and the price.

You get: scope letter

Day 3
Sensor fitted

One mirror port, under two hours, with no outage.

You get: coverage note

Days 3 to 30
Listen and draw

The asset list builds itself. We draw the zones with your team.

You get: asset list, zone map

Before each window
Outage plan

Every task, its hours, its rollback and the name that signs.

You get: signed outage plan

Every month
Review

One hour with your site lead on the report and the next three jobs.

You get: monthly site report

§4 Deliverables7 documents

Seven documents. All of them yours.

If you leave, they stay on your site. Another provider, or your own team, could pick up from them on day one.

Industrial firewall and switches with patched cables in a dark cabinet

Document

Arrives

Length

Written for

Site walk note

Day 1

1 page

Plant manager

Scope letter

Day 2

2 pages

Plant manager, controls lead

Asset list

Day 18, then kept current

Running list

Controls lead

Zone and conduit map

Day 26

1 drawing

Controls lead, site safety lead

Outage plan

Before each window

1 page

Plant manager, who signs it

Rollback sheet

Each window

1 page, taped in the cabinet

Night shift operator

Monthly site report

Each month

6 to 8 pages

Plant manager

Sample lengths for a two site plant.