Plant line, 24/7 +1-555-0164[email protected]
§1 ServicesService schedule / Sample year
Buy one or all six. Each runs under the same four signed rules and the same change windows, so your plant manager reads every job the same way.

§2 Where most plants startService 1 of 6

New devices | 2 |
New conversations | 1 |
Logic changes | 0 |
WatchesControl traffic from a mirror port, day and night
Never doesSend a packet, install an agent or scan a live line
Done byYour shift lead on Listen. Engineers on shift who know your drawing on Shift and Steward
Comes back asA weekly change digest and a monthly site report
On plansListen, Shift and Steward, priced per site
§3 How a service runsSame for all six
Every stage leaves a page behind. If you want to know why we touched something, it is written down and signed.
Half a day on foot with your controls lead. Nothing gets connected.
Each task gets its hours, its line, its rollback and the name that signs it.
Work happens only inside the signed window, with your operator beside us.
What changed, what we found, and what waits for the next shutdown.
§4 The other fiveServices 2 to 6
Each one works alone or next to monitoring. Most plants add them at the pace of their shutdown calendar.
Two days on your floor with your controls lead. You keep the network drawing, whatever you decide next.
Comes back asNetwork drawing, ranked findings
ScopeFixed, one site, two days
One call at 03:00 reaches an engineer who knows your drawing. Containment starts with keeping people safe and the process running.
Line+1-555-0164, 24/7
On plansShift and Steward
Every device, its firmware and its owner, kept current by the sensor.
Comes back asA list you own
CadenceAlways current
Firewalls, a plant DMZ and timed vendor access, phased so no line stops for the whole job.
Comes back asZone map, conduit list
CadenceAcross planned windows
What to patch at the next shutdown, what to shield instead, and what can safely wait.
Comes back asPatch, shield or wait list
CadenceBefore each shutdown
§5 Next stepHalf a day on foot
One site walk with your controls lead, no slides. If monitoring is not the right first step, we will say so.
