Uptime first.Nothing rebootswithout your name.

Wardline secures plants that cannot stop. We watch your control network passively, map it into zones and conduits, and do every change in a window you signed.

Line 4, one week
Sample data, fictional plant
166 of 168 hours running
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Sat 02:00 to 04:00: signed window, firewall rule change.
No other stops.

§2 Rules of engagementSample agreement

Four rules, signed before anyone from Wardline walks your floor.

R1

No active scans on a live line.

We learn the network from a copy of its traffic. Old controllers never see us.

R2

No agents on controllers.

Nothing is installed on a PLC, drive or safety system. Vendor support stays intact.

R3

No change outside your window.

Every change has a date, a rollback and an owner from your team.

R4

No reboot without your name.

If a restart is needed, operations approves it and stands beside us for it.

Plant manager
Site safety lead
Wardline site lead

§3 Zones and conduitsSample zone map

Your plant, drawn in zones.

IEC 62443 groups assets by what they do and how much they matter. Each conduit between zones gets one purpose, one owner and a short list of what may cross it.

L4

Business ITMail, ERP, planning

Not our zone
Conduit C1. Reports out, no remote desktop in.
L3.5

Plant DMZHistorian copy, patch server

We build this
Conduit C2. Historian copy, one direction.
L3

Site operationsHistorian, engineering stations

Change in window
Conduit C3. Named engineers, timed vendor access.
L2

Area controlHMI panels, SCADA servers, Line 1 to Line 6

Listen only
Conduit C4. Control traffic only, mirrored to the sensor.
L1

Basic controlPLCs, drives, remote I/O, including the 2004 units that nobody can patch

Listen only
Conduit C5. Fieldbus, left as installed.
L0

The processSensors, valves, motors. What the plant is here to run. We do not touch it.

Hands off
Open control cabinet with PLC modules and an industrial switch, a gloved hand on the door

§4 Passive monitoring

Open control cabinet with PLC modules and an industrial switch, a gloved hand on the door

Listen
only.

One mirror port on the switch. A sensor that receives and cannot send. We see every device and every new conversation, and the line never notices we are there.

0

packets sent to the control network by the sensor.

Connects toA mirror port or a hardware tap

InstallUnder two hours, with no outage. Sample figure.

ReadsModbus TCP, EtherNet/IP, PROFINET, DNP3, OPC UA

Tells youNew devices, new routes, firmware and logic changes

Night alertsGo to your shift lead with the next step in plain words

§5 Outage plan

No surprises. The whole week fits on one chart.

Before we start you see each task, the hours it needs, whether it touches a running line, and who has to sign.

Outage plan OP-26. Sample data.
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Connect sensor to mirror portMon, no outage
Listen and build the asset listMon to Thu, no outage
Review asset list with controls leadFri, no outage
DMZ firewall rule changeSat 02:00 to 04:00, signed by plant manager
Line 4 switch firmware, restart witnessedSat 02:00 to 04:00, signed by plant manager
PLC firmwareHeld for the March shutdown
No outage  Signed window  Held for next shutdown

§6 Site reportFictional client, sample figures

0

Stops caused by our work, in 14 months at a food plant running three shifts.

Engineer with a tablet on a steel walkway between tanks in a dark food plant

I expected a list of reasons to shut down. I got a map of my plant and a plan that fit the schedule I already had.

Plant manager, snack food producer. Fictional.

Scope2 sites, 6 lines, 412 devices

Findings2 High, 9 Low

Windows7 used, all signed

ResultVendor access now timed and logged

§7 Services

The work, from first walk to the night shift.

Engineer with a rugged laptop at an open PLC cabinet in a dim plant room
Two engineers in hard hats with a laptop on a cart beside a production line

§8 SectorsGuide only

Plants we know.

Each sector has its own rules and its own shutdown calendar. We start from yours.

Sector

Rules and guides we map to

Usual first job

Power

NERC CIP, IEC 62443

Substation asset list

Water

AWIA 2018, NIST SP 800‑82

Risk assessment for remote sites

Pipelines

TSA Security Directives, IEC 62443

Segmentation plan

Manufacturing

IEC 62443, NIS2 in the EU

Vendor remote access

Food and drink

IEC 62443, NIST SP 800‑82

Passive monitoring on packing lines

Cold storage

IEC 62443, NIST SP 800‑82

Asset list across the depots

Demo sample. A guide for illustration, not a certificate or legal advice.

§9 Field notes

Two engineers in hard hats with a laptop walking a plant gantry beside an open cabinet
Two engineers in hard hats with a laptop walking a plant gantry beside an open cabinet

Walk the plant with us.

Book a site walk

Half a day with your controls lead, on foot. Nothing gets connected. You get a one-page view of where to start.