Plant line, 24/7 +1-555-0164[email protected]

§1 PlansSB-02 / Sample bill

Three plans. No fee per signed window.
Sample bill, fictional plant

Priced bythe site.

Sites

2

Plan

Shift

Per site, per month

$3,200

Fee per signed window

$0

Sensors and install

Included

Monthly bill

$6,400

Count your sites and multiply by the rate. A busy month on the line costs the same as a quiet one, and a device count never changes the bill.

§2 The three plansUSD, per site, per month

Pick by who reads the alert at 03:00.

On Listen, alerts go straight to your shift lead. On Shift and Steward, one of our engineers reads each one first and calls you when a decision is yours.

Listen

per site, per month
$1,800
  • Passive sensor on your switches
  • Asset list, kept current
  • Weekly change digest
  • Night alerts to your shift lead
Book a site walk

Shift / Most sites start here

per site, per month
$3,200
  • Everything in Listen
  • Engineers on shift, 24/7
  • Plant incident line
  • Outage plan for every window
Book a site walk

Steward

per site, per month
$4,900
  • Everything in Shift
  • Patch planning before each shutdown
  • Zone and conduit design hours
  • Standards evidence pack
Book a site walk
Sample pricing for a fictional firm. One site minimum, 12 month term.

§3 Sample billsUSD per month

Engineer at a control room desk with network and process screens above a plant floor

The bill, before you sign.

Three sizes of operator at the three rates. Find your row and you know the number.

Sites

Listen

Shift

Steward

1

$1,800

$3,200

$4,900

3

$5,400

$9,600

$14,700

8

$14,400

$25,600

$39,200

Sample arithmetic for a fictional operator.

§4 Before you signSB-02 / Sample bill

Questions about the bill.

Why per site and not per device?

A device count changes every week, and nobody should hide a controller to save money. One price per site keeps the asset list honest.

Do we need a site assessment first?

No. The site walk is free and most plants start monitoring straight after it. A full site assessment is $12,500 fixed for one site and two days, if you want the network drawing first.

Can we change plans?

Move up in any month. Move down at the start of a new quarter. Your asset list, zone map and reports carry over.

Does an incident cost extra?

Response on a monitored site is part of Shift and Steward. Rebuild work after an incident is scoped separately, and you see the quote before anyone starts.

§5 Full comparisonSB-02 / Sample bill

Every line, side by side.

The same sensor and the same four rules on all three plans. What changes is who reads the alert, who plans the window and how much paper you get.

Monitoring

Line

Listen

Shift

Steward

Sensor on a mirror port

ListenYes

ShiftYes

StewardYes

Active scans on a live line

ListenNever

ShiftNever

StewardNever

Asset list

ListenKept current

ShiftKept current

StewardKept current

Night alerts

ListenTo your shift lead

ShiftRead by our engineer

StewardRead by our engineer

Response

Line

Listen

Shift

Steward

Plant line, 24/7

ListenYes

ShiftYes

StewardYes

First call on a High, target

ListenNext working day

Shift30 min

Steward30 min

Engineer on site

ListenQuoted

ShiftWithin 24 hours

StewardWithin 24 hours

Containment plan with your shift lead

ListenNo

ShiftYes

StewardYes

Changes

Line

Listen

Shift

Steward

Outage plan for each window

ListenNo

ShiftYes

StewardYes

Rollback sheet in the cabinet

ListenNo

ShiftYes

StewardYes

Patch planning

ListenNo

ShiftNo

StewardBefore each shutdown

Zone and conduit design

ListenNo

ShiftNo

Steward8 hours a month

Reporting

Line

Listen

Shift

Steward

Weekly change digest

ListenYes

ShiftYes

StewardYes

Monthly site report

ListenYes

ShiftYes

StewardYes

Standards evidence pack

ListenNo

ShiftNo

StewardYes

Terms

Line

Listen

Shift

Steward

Per site, per month

Listen$1,800

Shift$3,200

Steward$4,900

Fee per signed window

ListenNone

ShiftNone

StewardNone

Minimum

Listen1 site

Shift1 site

Steward1 site

Sensors and install

ListenIncluded

ShiftIncluded

StewardIncluded

Sample terms for a fictional firm.

§6 End of billSB-02 / Sample bill

Tell us how many sites. We will send the number.

Plant line, 24/7