Plant line, 24/7 +1-555-0164[email protected]

§1 Trust and complianceDemo sample / Fictional business

What a plant manager should be able to check.

Checkour work.

We ask you to let us onto your control network, so we keep the same records we ask of you. Here is what we would show you, and a real site report to read before you sign.

Open control cabinet with PLC modules and an industrial switch, a gloved hand on the door
Register status

Entries listed

4

Last reviewed

Oct 2026

Status

Demo sample

§2 Your plant dataDemo sample / Fictional business

What leaves your site.

The short answers. The long ones are in the agreement your plant manager signs.

Raw traffic

Stays on the sensor, on your site, for 30 days. It never leaves.

What leaves

Alerts, the weekly change digest and the monthly report.

Who can read it

Named engineers on your account, signed in with hardware keys.

Every read

Logged, and you can ask for that log.

Remote access

Only through your own gateway, in a window, never a standing link.

When you leave

We collect the sensor and wipe it in front of your controls lead.

§3 CertificationsDemo sample / Fictional business

Four papers to ask any OT firm for.

Wardline OT is a fictional business, so nothing below has been audited or issued. These rows show how a real firm would list its own.

IEC 62443 service provider assessment

Independent check of how a firm installs and maintains control system security at client sites.

Demo sample
Sample cycle: 3 years

ISO/IEC 27001:2022

Certificate for the information security management system that runs the sensor fleet.

Demo sample
Sample cycle: 3 years

SOC 2 Type II

Attestation report on the Security and Availability criteria, covering the alert service.

Demo sample
Sample period: 12 months

Contractor safety record

Site safety prequalification, so your safety lead can clear us before the walk.

Demo sample
Sample cycle: yearly
Demo content. No certificate, attestation or audit exists for this fictional business.

§4 FrameworksEvidence map

One site, filed five ways.

Each document names the framework it answers, so your auditor finds the evidence without a second round of questions.

Framework

What it asks for

Where we show it

IEC 62443

Asks for:Zones, conduits and a security level for each zone

Shown in:Zone and conduit map

NIST SP 800-82

Asks for:Asset inventory, monitoring and segmentation

Shown in:Asset list, monthly site report

NERC CIP

Asks for:Electronic perimeters and change records

Shown in:Outage plans, change log

TSA Security Directives

Asks for:Segmentation, access control and an incident plan

Shown in:Segmentation plan, incident runbook

AWIA 2018

Asks for:A risk and resilience assessment

Shown in:Site assessment report

A guide for illustration, not a compliance claim. Sector rules are on the Industries page.

§5 Sample site reportSR-214 / Sample report

Read one before you sign.

We send the full SR-214 site report as a PDF: a snack food producer, 14 months without a stop. The client is fictional. The format is the one you would get.

The plant week, hour by hour
Asset list and zone map
Findings, High and Low
Every window, who signed it
What waits for the next shutdown