Home Title
Home Title M
 
 
 
7 kW Home

Full by Morning, on the Cheap Hours.

Our home charger adds about 25 miles for every hour plugged in — empty to full overnight in 6–8 hours, timed by the app to the cheapest rate of the night.

7 kW · AC Level 2
From $1,240 installed
 
Plugged In
Driveway
≈ 25mi/h

Miles added for every hour plugged in — a 30-mile commute is back in about 75 minutes.

 
 
 
 
 
 
 
 
 
 
 
Oakfield, CA
 
7 kW · J1772 or NACS · 3-yr parts & labour
 
 
 
 
A Week Plugged In

Where a Week of Driving Goes

Here is what an ordinary week asks of the charger in a household that drives about 10,000 miles a year. The commute takes the biggest share — and the app fits all of it into the off-peak window.

A Typical Week
A Road-Trip Week
≈ 25mi/h
Added per hour plugged in
6–8h
Empty to full, overnight
12¢/kWh
Off-peak, 00:00–05:00
Typical Week · 192 miles
Energy used
Commute
5 days × 22 miles
 
 
31.4 kWh
Weekend trip
40 miles
 
 
11.4 kWh
School runs
30 miles
 
 
8.6 kWh
Errands
12 miles
 
 
3.4 kWh
Cabin preheat
Cold mornings, while plugged in
 
 
1.8 kWh
Standby & app
Charger and Wi-Fi link
 
 
0.3 kWh
Ready-by reserve
The schedule keeps 80% by 07:00 for a surprise trip
 
80%
 
 
 
 
Installation

From Photos to First Charge in Nine Days

One electrician, one van, no subcontractors. You send four photos, we send one fixed price, and the install itself takes three to four hours.

Day 1
Photo Survey

Your panel, the meter, where you park and the cable route — four photos from your phone.

Day 2
Fixed Quote

One price with the permit and utility notice included. It holds for 60 days and does not move on the day.

Day 6
Install

One electrician, three to four hours: load check, tidy conduit, charger mounted and tested.

Day 9
Inspection & First Charge

City sign-off, the app paired to your car and the off-peak schedule set with you.

Voltline electrician levelling a charger mount on a brick wall
Garage
Driveway wall
Pedestal post
Up to 15 m cable run included · Permit filed by us · Site visit needed ~1 in 8
Electrician wiring a wall charger in a bright home garage
 
Status ring
Cyan while charging, white when the car is full, a slow pulse while it waits for the off-peak window.
 
 
 
 
Specifications

The Numbers on the Label

a.Charging
Output
7 kW AC (Level 2)
Miles per hour
≈ 25
Full charge
Overnight, 6–8 h
Connector
J1772 or NACS
Cable
7.5 m, tethered
Circuit
40 A dedicated
b.Unit
Size (H × W × D)
340 × 220 × 115 mm
Weight
4.6 kg
Casing
IP65 · indoor or outdoor
Operating range
−30 °C to 50 °C
Mounting
Wall or pedestal post
Finish
Graphite, cyan ring
c.Smart & Safety
Connectivity
Wi-Fi + 4G backup
Scheduling
Off-peak + solar-match
Load management
Built in, no trips
Fault protection
6 mA DC detection
PDF · 4 KB · updated Oct 2026
 
 
 
 
Questions

Asked Before Booking

The five questions our electricians hear most about the home charger. The rest live on the FAQ page.

Talk to an electrician
+1-555-0163 · Mon–Sat 7:30–18:00. Have a photo of your panel handy and we'll check it on the call.

Do I need a panel upgrade?

Usually not. The charger has load management built in: it watches the whole house and slows down before the main breaker would trip. Your panel photo tells us on day one — about 1 in 8 surveys need a site visit.

Which connector do I get, J1772 or NACS?

Whichever your car uses. The 7.5 m cable is fitted for your car on install day; if you change cars later, we swap the cable for the other standard at cost.

How does off-peak charging work?

Set a ready-by time in the app — say 80% by 07:00. The charger waits for the cheapest window, 00:00–05:00 on most plans, and only tops up outside it if it has to.

Can it charge from my solar panels?

Yes, with the solar-match kit (+ $180 fitted). A clip-on sensor at the meter lets the charger follow your rooftop surplus at midday instead of exporting it.

What is included in the $1,240?

The charger, mounting, up to 15 m of cable run, the permit, the utility notice and the city inspection, plus 3-year parts and labour. Longer runs are $14 per metre, quoted up front.

 
 
 
 
Warranty

Three Years, Written Down

Parts and labour for three years, remote diagnostics for life. If the charger or our wiring lets you down, the fix is on us.

Port uptime · all Voltline sites
98% floor, 98.9% average
 
 
 
 
 
 
 
 
 
 
 
Floor we report against · 98%
D
J
F
M
A
M
J
J
A
S
O
Dec 2025 – Oct 2026 · scale from 95% · share of time every port was ready to charge, measured nightly.
3yrs

Parts & Labour, Included

If the charger or our wiring fails inside three years, we fix it — parts, labour and the call-out.

24/7

Diagnostics for Life

Every charger checks in with our desk. We usually spot a fault and start fixing it before you notice.

 
Four Photos · One Fixed Price

Send the Photos Tonight.

Home, workplace or depot — four photos from your phone and an electrician sends one fixed price the next working day. Permit included, holds for 60 days.

3-yr parts & labour
 
Permit included · 9 days to first charge
 
Rather Talk It Through?

Speak to an electrician, not a script.

+1-555-0163
Install line · Mon–Sat 7:30–18:00
[email protected]
Replies the next working day
1180 Meridian Road, Unit 4
Workshop · Oakfield, CA 95000
Fleet support 24/7
[email protected]