Depot Night Title
Depot Night Title M
 
 
 
60 kW DC Fleet

Vans Out by 5:30, Every Morning.

DC fast charging for depots, planned from a power study of the supply you already have. A mid-size van goes from 20 to 80% in about 45 minutes; the rest of the fleet fills overnight on AC.

60 kW DC · CCS1 + NACS
Quoted per depot
 
Kessling Parcel
Foundry Road
7¢/mile

Energy cost per van-mile at the Oakfield depot, down from 24¢ on diesel — 48 vans, 0 routes missed in 14 months.

 
 
 
 
 
 
 
 
 
 
 
Oakfield, CA
 
60 kW DC · CCS1 + NACS · fleet support 24/7
 
 
 
 
A Night at the Depot

One Night, Shared Across the Depot

Here is where one weeknight's energy went at Kessling Parcel's Foundry Road depot: 48 vans on 6 DC and 42 AC bays, all under the existing 400 kVA supply.

A Weeknight
Peak Season
48vans
On 6 DC + 42 AC bays
45min
20–80%, mid-size van
0
Routes missed in 14 months
Foundry Road · Wednesday night
Energy delivered
AC bays 1–14
Long routes, 18:00–05:00
 
 
840 kWh
AC bays 15–28
City routes
 
 
690 kWh
AC bays 29–42
Short routes
 
 
520 kWh
DC bays 1–6
Late returns, 20–80%
 
 
410 kWh
DC lunch top-ups
Afternoon routes
 
 
230 kWh
Yard & office
Lights, heat, gate
 
 
60 kWh
Supply cap held by the depot plan
The existing 400 kVA has never been exceeded
 
400 kVA
 
 
 
 
Installation

From Power Study to First Roll-Out

A fleet engineer owns the job from the first meter reading to the morning the vans roll out on electric. The depot keeps running throughout.

Week 1
Power Study

Meter data, routes and departure times — we model the depot on the supply you already have.

Week 3
Depot Plan & Price

A bay layout, a charging schedule by route and one written price for the depot.

Week 8
Phased Install

DC cabinets and AC bays go in a row at a time, so routes keep leaving on time.

Week 10
First Roll-Out

Commissioning, the depot dashboard live, and a fleet engineer on site for the first 5:30 departure.

Electric delivery vans lined up at a depot at dawn
Parcel & delivery
Public works
Buses
Power study included · Existing supply first · Fleet support 24/7
DC fast charging cabinet at a depot
 
Bay status light
Cyan while charging, white when the van is ready, a slow pulse while it waits its turn in the schedule.
 
 
 
 
Specifications

The Numbers on the Cabinet

a.Charging
Output
60 kW DC
20–80%, mid-size van
About 45 min
Connectors
CCS1 + NACS
Cable
5 m, management arm
Power sharing
Dynamic, depot-wide
Back office
OCPP 2.0.1 dashboard
b.Cabinet
Size (H × W × D)
1,900 × 750 × 600 mm
Weight
340 kg
Casing
IP55 · IK10
Operating range
−30 °C to 50 °C
Noise
Under 55 dB
Mounting
Plinth, bollards
c.Depot & Support
Power study
Included in the quote
Scheduling
By route and departure
Fleet support
24/7, our own engineers
Reporting
Cost per mile, per van
PDF · 4 KB · updated Oct 2026
 
 
 
 
Questions

Asked Before the Power Study

The five questions fleet managers ask most before a depot goes electric. The rest live on the FAQ page.

Talk to the fleet desk
[email protected] · +1-555-0163, fleet support 24/7. Send your route list and Amara will sketch a depot plan.

Do we need a bigger grid connection?

Often not. The power study models your routes and departure times against the supply you already have. Kessling's 48 vans run on the existing 400 kVA — it has never been exceeded.

How many DC chargers do we need?

Fewer than most people expect. Most vans fill overnight on AC; DC covers late returns and lunchtime top-ups. Kessling runs 6 DC and 42 AC bays for 48 vans.

Which connectors do you fit?

CCS1 and NACS on every DC cabinet, so mixed fleets and future vans plug into the same bay.

What happens if a charger fails at 3 AM?

The depot dashboard alerts our fleet desk, staffed 24/7 by our own engineers. The schedule moves sessions to another bay while we fix it.

How is a depot priced?

Quoted per depot after the power study, with the bay layout, install phases and support plan written into one price.

 
 
 
 
Uptime & Support

Uptime, Written Down

A depot cannot wait for a callback. Fleet sites get remote monitoring, 24/7 support from our own engineers and a monthly uptime report.

Port uptime · all Voltline sites
98% floor, 98.9% average
 
 
 
 
 
 
 
 
 
 
 
Floor we report against · 98%
D
J
F
M
A
M
J
J
A
S
O
Dec 2025 – Oct 2026 · scale from 95% · share of time every port was ready to charge, measured nightly.
24/7

A Desk That Answers

Fleet support is staffed around the clock by our own engineers — never a call centre, never a voicemail.

98.9%

Uptime You Can See

Port uptime across every site we look after, measured nightly and shown in your monthly report.

 
Four Photos · One Fixed Price

Send the Photos Tonight.

Home, workplace or depot — four photos from your phone and an electrician sends one fixed price the next working day. Permit included, holds for 60 days.

3-yr parts & labour
 
Permit included · 9 days to first charge
 
Rather Talk It Through?

Speak to an electrician, not a script.

+1-555-0163
Install line · Mon–Sat 7:30–18:00
[email protected]
Replies the next working day
1180 Meridian Road, Unit 4
Workshop · Oakfield, CA 95000
Fleet support 24/7
[email protected]