Workplace Title
Workplace Title M
 
 
 
22 kW Workplace

Charging That Pays Its Own Way.

A twin-socket post for car parks where cars stay for hours. Drivers pay per kWh in the app, the site gets a payout every month, and up to 24 bays share one 100 A feed.

22 kW · twin socket
From $4,850 per post
 
Copperline · Bay 04
One session
41.6kWh

1 h 54 min at 22 kW — billed $12.48 to the driver at 30¢ per kWh, paid out to the site monthly.

 
 
 
 
 
 
 
 
 
 
 
Oakfield, CA
 
22 kW · 2 bays per post · per-kWh billing
 
 
 
 
A Day in the Car Park

One Feed, Shared Out by the Bay

Here is where one weekday's energy went at Copperline Offices: 24 bays on a single 100 A feed. Load management shares the power, so every car leaves with what its driver needs.

A Typical Weekday
A Full Car Park
24bays
On one 100 A feed
30¢/kWh
Billed in the app
$576
Billed last month
Copperline Offices · Tuesday
Energy delivered
Bay 04
Facilities van, 1 h 54 min
 
 
41.6 kWh
Bay 11
Commuter, 6 h plugged in
 
 
18.2 kWh
Bay 07
Commuter, 4 h plugged in
 
 
12.9 kWh
Bays 01–03
Visitors, short stays
 
 
9.6 kWh
Bay 16
Commuter, 3 h plugged in
 
 
8.4 kWh
Bay 20
Commuter, 2 h plugged in
 
 
5.1 kWh
Pool cars
Scheduled overnight
 
 
4.2 kWh
Feed cap held by load management
Never above 100 A, however many cars plug in
 
100 A
 
 
 
 
Installation

A 12-Bay Site, Live in Five Weeks

One project lead, our own crew, and the utility paperwork handled for you. Most car parks stay open throughout — we work a row at a time.

Week 1
Site Survey & Load Study

Photos, the switchboard and a week of meter data — we size the feed before we price a single post.

Week 2
Fixed Quote & Utility

One price per post, trenching and permit included. We file the utility application the same day.

Week 4
Install

Posts set and cable pulled a row at a time, so the car park stays open all week.

Week 5
Live & Billing

Bays commissioned, your price per kWh set in the app and the first payout scheduled.

Apartment garage with a row of wall chargers
Offices
Apartments
Hotels
Up to 24 bays on one 100 A feed · Permit filed by us · Payouts monthly
Hotel car park at dusk with pedestal chargers
 
Bay number light
Cyan while charging, white when the bay is free, amber if a cable is left unplugged.
 
 
 
 
Specifications

The Numbers on the Post

a.Charging
Output
22 kW AC per post
Sockets
2 · one per bay
Miles per hour
Up to 75, car allowing
Cables
J1772 or NACS
Load management
24 bays on 100 A
Scheduling
Per bay or site-wide
b.Post
Size (H × W × D)
1,400 × 300 × 220 mm
Weight
38 kg
Casing
IP65 · IK10 impact
Operating range
−30 °C to 50 °C
Mounting
Pedestal or wall pair
Display
Bay number + ring
c.Billing & Access
Driver payment
Per kWh in the app
Payouts
Monthly to the site
Access
Public, staff or both
Reporting
Monthly kWh per bay
PDF · 4 KB · updated Oct 2026
 
 
 
 
Questions

Asked Before Signing

The five questions facilities managers ask most about workplace charging. The rest live on the FAQ page.

Talk to the workplace team
+1-555-0163 · Mon–Sat 7:30–18:00. Send a site plan and Kenji will sketch the bays on the call.

How does per-kWh billing work?

Drivers start a session in the Voltline app and pay per kWh at the price you set — 30¢ at Copperline. We collect it and pay the site out monthly, with a report per bay.

Can staff charge free while visitors pay?

Yes. Access and price are set per group — staff-only, public, or both, each at its own price — or free for pool cars.

Will 24 cars trip our supply?

No. Load management shares one 100 A feed across up to 24 bays and never goes above it. Cars that have waited longest are topped up first.

How long does a site take?

A typical 12-bay site is live in five weeks: survey and load study, a fixed quote, about a week of install, then commissioning and billing set-up.

What does a post cost?

From $4,850 per post installed — two bays each — with trenching, permit and commissioning quoted up front. State and utility rebates for workplace chargers vary; we check what applies to your address.

 
 
 
 
Warranty

Three Years, Written Down

Parts and labour for three years on every post, remote diagnostics for life, and a monthly report of kWh and payouts per bay.

Port uptime · all Voltline sites
98% floor, 98.9% average
 
 
 
 
 
 
 
 
 
 
 
Floor we report against · 98%
D
J
F
M
A
M
J
J
A
S
O
Dec 2025 – Oct 2026 · scale from 95% · share of time every port was ready to charge, measured nightly.
3yrs

Parts & Labour, Included

If a post or our wiring fails inside three years, we fix it — parts, labour and the call-out.

98.9%

Uptime You Can See

Port uptime across every site we look after, measured nightly and shown in your monthly report.

 
Four Photos · One Fixed Price

Send the Photos Tonight.

Home, workplace or depot — four photos from your phone and an electrician sends one fixed price the next working day. Permit included, holds for 60 days.

3-yr parts & labour
 
Permit included · 9 days to first charge
 
Rather Talk It Through?

Speak to an electrician, not a script.

+1-555-0163
Install line · Mon–Sat 7:30–18:00
[email protected]
Replies the next working day
1180 Meridian Road, Unit 4
Workshop · Oakfield, CA 95000
Fleet support 24/7
[email protected]