Ten sites we wired and still look after — from a 7 kW charger in an Elm Hollow driveway to 48 electric vans leaving a depot full at 5:30.
Across 140 workplace and multifamily sites and 22 fleet depots, read from the chargers themselves.






A parcel depot that went electric without a new grid connection. Fourteen months on, the vans still leave full at 5:30.

48 electric vans on 6 × 60 kW DC and 42 AC bays, all on the depot's existing 400 kVA supply. Every van rolls out full at 5:30.
Chargers installed since 2016, by our own crew
Workplace and multifamily sites we look after
Fleet depots charging between shifts
Port uptime across every site, from the chargers' own logs
Bays, how long each took to go live and what drivers pay — read from the app, not a brochure. Click a site for the full story.
Home, workplace or depot — four photos from your phone and an electrician sends one fixed price the next working day. Permit included, holds for 60 days.