Hero Title
Hero Title M
 
 
 
Copperline Offices

Twenty-Four Bays on One Feed.

Facilities wanted staff charging without a new supply or a meter to read. Twelve twin-socket posts now share one 100 A feed and bill drivers in the app.

Copperline Business Quarter
Live since Mar 2025
 
Last Month
Billed
$576

1,920 visitor kWh at 30¢, paid in the app. Staff charge free on the same 24 bays.

 
 
 
 
 
 
 
 
 
 
 
Case Study · Workplace
 
12 × 22 kW twin-socket · 24 bays · 100 A
 
 
 
 
01 · The site

Staff Charging Without a New Supply

What the car park had, what we fitted in five weeks and what the app shows a year on.

01

The Problem

A covered staff and visitor car park with one spare 100 A feed. The first quote Copperline had asked for a new supply, a transformer and someone to read meters every month.
02

What We Fitted

Twelve 22 kW twin-socket posts — 24 bays — sharing the existing feed through load management, with two driver groups in the Voltline app: staff free, visitors 30¢ per kWh. Survey to first session in five weeks.
03

What Changed

Nothing trips when every bay is taken; the posts share the power instead. Staff charge free; visitors pay by card and the takings land in Copperline's account every month — last month $576 for 1,920 kWh.
 
Project Sheet
Project 2025-024
Client
Copperline Offices
Location
Copperline Business Quarter, Oakfield
Site
Covered staff and visitor car park
Chargers
12 × 22 kW twin-socket posts (24 bays)
Supply
One 100 A feed, load-managed
Billing
Staff free · visitors 30¢ per kWh in the app
Installed
Mar 2025 · live in 5 weeks
Last month
3,480 kWh · 1,920 kWh billed to visitors = $576
 
 
 
 
02 · In their words

No Meters to Read, Ever

Marcus Bell, who runs facilities at Copperline, on year one.

I was braced for a new supply and a monthly meter-reading job. Instead the posts share the feed we already had, drivers pay in the app and the money lands in our account. Bay 04 did 41.6 kWh this morning and I didn't touch a thing.

Portrait of Marcus Bell
Marcus Bell
Facilities, Copperline Offices
Bay 04 · 41.6 kWh in 1 h 54
$12.48 billed at 30¢
 
 
 
 
03 · The numbers

Energy Delivered, Month by Month

kWh through all 24 bays over the last twelve months, split by driver group in the app: staff charge free, visitors pay 30¢.

Energy delivered, kWh
 
Staff · free
 
Visitors · 30¢
1,000
2,000
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
October: 3,480 kWh delivered · 1,920 visitor kWh billed at 30¢ = $576
12 months
34,860 kWh
Through 24 bays on one 100 A feed
Last month
$576
1,920 visitor kWh billed · staff free
Live in
5 weeks
From survey to the first session
 
 
 
 
04 · Gallery

Around the Car Park

Twelve posts down the covered rows, one feed in the plant room and one app for the facilities desk.

Covered car park at dusk with a row of wall chargers lit in cyan and cars plugged in
Covered rows at dusk · 24 bays
Office car park with a car plugged into a workplace charging cabinet under the trees
Office car park with a car plugged into a workplace charging cabinet under the trees
Twin-socket 22 kW posts
Phone showing the Voltline app beside a home charger at night
Phone showing the Voltline app beside a home charger at night
Visitors pay per kWh in the app
Electric vans charging at DC cabinets in a depot at night
Previous Case Study
Kessling Parcel, Oakfield Depot
Next Case Study
Elm Hollow Driveway
Timber-clad house at sunset with a car plugged into a wall charger by the front door
 
Four Photos · One Fixed Price

Send the Photos Tonight.

Home, workplace or depot — four photos from your phone and an electrician sends one fixed price the next working day. Permit included, holds for 60 days.

3-yr parts & labour
 
Permit included · 9 days to first charge
 
Rather Talk It Through?

Speak to an electrician, not a script.

+1-555-0163
Install line · Mon–Sat 7:30–18:00
[email protected]
Replies the next working day
1180 Meridian Road, Unit 4
Workshop · Oakfield, CA 95000
Fleet support 24/7
[email protected]