Dc Charger Title
Dc Charger Title M
 
 
 
Oakfield Public Works Yard

Two Shifts, One Midday Turnaround.

A city yard where half the vans and sweepers go out twice a day. Four DC posts cover the midday turnaround; AC bays fill everything overnight.

Canal Street, Oakfield
Live since Jun 2025
 
Midday 20–80%
60 kW DC
45min

About how long a mid-size van takes on a DC post between the morning and afternoon shifts.

 
 
 
 
 
 
 
 
 
 
 
Case Study · Fleet
 
4 × 60 kW DC · 14 × 11 kW AC · 22 vehicles
 
 
 
 
01 · The yard

A Yard That Never Closed

Four weeks of site data, three weekends of install and a midday window that decides everything.

01

The Problem

Eighteen vans and four street sweepers on two shifts, with a midday turnaround where half the fleet comes back and goes straight out again. The yard could not shut on a weekday.
02

What We Fitted

A four-week power study first, included in the quote. Then 4 × 60 kW DC posts for the midday turnaround and 14 × 11 kW AC bays for the overnight fill, installed over three weekends.
03

What Changed

A van comes back at 20% and leaves at 80% in about 45 minutes. Everything else waits for the cheap night window, and the yard opened every Monday as usual.
 
Project Sheet
Project 2025-088
Client
City of Oakfield Public Works
Location
Public Works Yard, Canal Street
Vehicles
18 vans + 4 street sweepers
Chargers
4 × 60 kW DC + 14 × 11 kW AC
Shifts
Two, with a midday turnaround
Installed
Jun 2025 · phased over three weekends
Power study
Included, four weeks of site data
Result
Midday 20–80% in about 45 minutes
 
 
 
 
02 · From the crew

The Data Said Four Posts

Amara Okafor, who ran the power study and the DC commissioning.

Four weeks of site data told us the midday turnaround was the only hard part. Four DC posts cover it with room to spare; everything else can wait for the cheap night, so the supply never needed touching.

Portrait of Amara Okafor
Amara Okafor
Fleet Charging Engineer, Voltline
Power study · 4 weeks
20–80% in about 45 min
 
 
 
 
03 · The numbers

Diesel Before, Charging After

Monthly energy spend for the 22 vehicles: the last year on diesel against the first year on the yard's chargers.

Monthly energy spend, USD
 
Diesel, year before
 
Electric, year one
$0
$4,000
$8,000
$12,000
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Same routes and shifts · charging at the yard's own tariff, mostly overnight
Year before
$117,700
Diesel for 22 vehicles
Year one
$36,487
Charging at the yard
Saved
$81,213
In the first twelve months
 
 
 
 
04 · Site log

A Day With Two Shifts

A Thursday in March, read from the yard's chargers — the overnight fill, the midday rush and the evening return.

Window
Vehicles
Energy
Chargers
00:00–05:00
Overnight fill, cheapest window
22
610 kWh
14 × 11 kW AC
11:30–12:15
Midday turnaround, 20→80%
8
236 kWh
4 × 60 kW DC
12:15–13:00
Sweepers top up
4
118 kWh
DC + AC
18:30–20:00
Second shift back
22
—
Queued for off-peak
45 min
22
3
Midday 20–80%, mid-size van
Vehicles on two shifts
Weekends to install
Turnaround
12 Mar 2026
11:32
Van 07 plugs in at 21%
11:33
DC post 2 ramps to 60 kW
11:58
Van 07 at 58%; sweeper 2 joins post 4
12:16
Van 07 at 80% · unplugged
12:20
Second-shift crew signs the van out
Van 07 charge
21% → 80%
 
 
 
 
 
 
 
 
 
 
 
 
05 · Gallery

Around the Yard

Four DC cabinets by the gate, AC bays along the fence and a first shift that leaves full.

DC fast charging cabinet at a depot
DC cabinets by the yard gate
Electric delivery vans lined up at a depot at dawn
Electric delivery vans lined up at a depot at dawn
Vans lined up for the first shift
Voltline electrician levelling a charger mount on a brick wall
Voltline electrician levelling a charger mount on a brick wall
Weekend install, yard open on Monday
Office car park under a long solar carport with charging cabinets
Previous Case Study
Meridian Business Park
Next Case Study
Brookside Solar Home
Couple standing by their car as it charges from a wall charger on a timber garage at sunset
 
Four Photos · One Fixed Price

Send the Photos Tonight.

Home, workplace or depot — four photos from your phone and an electrician sends one fixed price the next working day. Permit included, holds for 60 days.

3-yr parts & labour
 
Permit included · 9 days to first charge
 
Rather Talk It Through?

Speak to an electrician, not a script.

+1-555-0163
Install line · Mon–Sat 7:30–18:00
[email protected]
Replies the next working day
1180 Meridian Road, Unit 4
Workshop · Oakfield, CA 95000
Fleet support 24/7
[email protected]