4 wind farms operating · 201 MW · 2,340 neighbours hold shares
Home / Community / FAQ
FILE WW-P08 · REV. 10/2026
[ Questions neighbours ask ]

Straight answers
from the ridge.

Shares, sound, shadow flicker, trucks on the lane and where the fund money goes — answered by the engineers, ecologist and liaison team who deal with them every week.

24 ANSWERS
4 TOPICS
UPDATED 10/2026
ANSWER DESK
WW-FAQ · 2026
2WORKING DAYS
The longest you wait for a written reply when your question isn’t covered here — from a named person at the site office.
NEXT DROP-IN
Sat 08 Nov · Norrow Grange
MOST ASKED
Turbine sound
SITE OFFICE
 
ON THIS PAGE
01   Ask in person
02   Shares & the offer
03   Living nearby
04   Direct lines
01 / Ask in person

Most answers are better over a map.

The written answers below cover the questions we hear most. If yours is about one field, one lane or one view, come to a drop-in — the people who drew the layout will be there.

SAT 08 NOV

Norrow Grange Hall

The Norrow Hill application, the 3:1 habitat plan and the photomontages from every lane.

10:00–14:00 · NO BOOKING
TUE 11 NOV

Sable County Library

Hartfell Edge share offer Q&A with the co-op board at 18:30 — bring the questions you’d rather ask face to face.

17:00–20:00 · NO BOOKING
SAT 15 NOV

Online briefing

Forty minutes on the offer and the build, then open questions. The recording goes to everyone registered.

11:00–12:00 · REGISTER BY EMAIL
MON–FRI

Site office, Larch Valley

210 Prairie Road, Suite 4. Walk in and ask for whoever’s on the liaison desk — maps and study reports on the table.

8:30–17:30 · ANY WEEKDAY
02–05 / Topics

Pick a topic, or read the lot.

Six answers per topic, written by the people who handle each question on our sites. Anything about one particular house gets a written answer from the liaison desk.

Shares & the offer
6
Living near a turbine
6
The local fund & bill discount
6
Construction & roads
6
Portrait of Lucia Ortega
Lucia Ortega
Community Liaison

“If your question is about your own house or lane, ring me — I’d rather walk the field with you than write a paragraph.”

LIAISON DESK
EMAIL
T-01 · SECTION 02

Shares & the offer

6 ANSWERS

Who can buy shares in Hartfell Edge?

Any adult resident of Larch, Owen or Sable County can join the Westerly Community Energy Co-op. Until 15 November people living within 15 miles of the site get priority; after that the offer opens to everyone until it closes on 30 November 2026 or the $4.8M is raised, whichever comes first.

How much can I put in?

From $250 up to $25,000 per member. Every member has one vote at the co-op AGM, whatever the size of their holding — someone with $250 has the same say as someone with $25,000.

How is interest decided?

Returns depend on project performance — see the offer document. Interest depends on how much the farm generates and what the power sells for, and in a poor year it can be lower or nil. Read the offer risks before you apply.

Can I lose money?

Yes. Your capital is at risk. Community shares are not a bank deposit and are not covered by any deposit protection scheme. If the farm performs badly, or the co-op fails, you could get back less than you put in, or nothing.

When do I get my money back?

Capital is repaid in instalments from year 6 of operation to the end of the 20-year term, if the co-op’s cash allows. Shares cannot be sold on an exchange; withdrawals before then are at the board’s discretion and only from a limited annual fund.

Does Westerly profit from the co-op’s share?

The co-op buys 20% of the project on the same terms as Westerly’s own 80% — the same costs, the same share of revenue. Its board of seven is elected by members; Westerly has one non-voting observer seat.

T-02 · SECTION 03

Living near a turbine

6 ANSWERS

How loud will the turbines be at my house?

Our condition for every Hartfell Edge home is 35 dB(A) or less, measured outside — roughly a quiet bedroom. The layout was moved twice to keep to it. If you think a turbine is louder than that, call the site line and we send an independent acoustician; the result is published either way.

What is shadow flicker, and will I get it?

When the sun is low behind a turning blade, the shadow can flicker through a window. We model every home within ten rotor diameters. Where a house could see more than 30 minutes on any day, the turbine’s controller stops it during those minutes — automatically, every year.

Will the turbines affect TV, phone or radio signal?

Modern digital signals are rarely affected. We survey reception before construction; if your signal drops after the turbines turn, we pay to fix it — a new aerial, a satellite dish or a booster — within 30 days of you telling us.

Why did you move two turbines 140 metres?

Two years of bat radar showed a commuting route along the Hartfell beck at dusk. Moving turbines T7 and T12 140 metres east took them out of it, at the cost of a little output. The full study is on the Environment page.

What happens to the land around each turbine?

Each turbine needs a foundation, a crane pad and a track — about 0.4 hectares in all. Everything else stays farmed or grazed. On Hartfell Edge 3 hectares of wildflower meadow are being restored for every hectare we use.

What happens when the turbines are 30 years old?

They come down. A $3.4M decommissioning bond, held by the county from day one, pays to remove the turbines, break out the top metre of each foundation and restore the ground — even if Westerly no longer exists. About 94% of each turbine is recyclable.

T-03 · SECTION 04

The local fund & bill discount

6 ANSWERS

How much goes into the local benefits fund?

$5,000 per megawatt per year, from the first day each farm generates, for the life of the farm. Across the fleet that has paid out $6.3M since 2016, $1.0M of it this year, through 486 grants.

Who decides which projects get a grant?

A panel of five residents and two Westerly staff, chaired by a resident. Panel members serve two years and declare any interest. Decisions and amounts are published after every round.

How do I apply for a grant?

Any community group, school or not-for-profit within the fund area can apply online or at the site office. Grants run from $500 to $40,000; the typical award is $12,900. The next round closes on 9 January 2027.

Who gets the bill discount?

Every home within two miles of an operating turbine — 2,140 households today. The discount is $320 a year, applied by your electricity supplier in two instalments. It doesn’t depend on whether you hold shares.

Do I have to apply for the discount?

No. We send the list of eligible addresses to the supplier each spring. If you have moved in recently and the discount isn’t on your bill by June, call the site office and we add you.

Can the fund pay for something that isn’t green?

Yes. The fund pays for what the community asks for — playground repairs, a minibus, music lessons, a defibrillator. Energy-saving projects are welcome but not required.

T-04 · SECTION 05

Construction & roads

6 ANSWERS

When will Hartfell Edge be built?

Construction started in March 2026. All 20 foundations were poured by October; turbine lifts run from Q2 2027 and first power is planned for Q3 2027. The site timeline is updated every month on the How We Build page.

How many trucks will use our lane?

Most deliveries — concrete, stone, cable — come in through the new site entrance at Hartfell Road gate 3, reached from County Road 9 — not through the village lanes. The 60 blades arrive in night convoys with escort vehicles, announced at least seven days ahead by text and on the News page.

What hours do crews work?

Monday to Friday 7:00–19:00 and Saturday 8:00–13:00. Concrete pours and blade convoys sometimes run outside those hours; neighbours within a mile get a text the week before.

Will the build bring local jobs?

So far 64 of the 112 people working on Hartfell Edge live in the three counties. Open roles — including technician apprenticeships at the Calder Ridge base — are listed on the Careers page.

Who repairs the roads if they get damaged?

We survey every route on video before construction and again after. Any damage we cause is repaired at our cost, to the county’s standard, and the county engineer signs it off.

Who do I call if something goes wrong on site?

The site line, +1-555-0165, is answered 24 hours a day by someone who can stop the work. Every call is logged, and the log is reviewed at the monthly liaison meeting.

06 / Direct lines

Still asking? Skip the switchboard.

Each desk is answered by the team that does the work. The site line is staffed around the clock by someone who can stop a crew.

D-01

Share offer desk

Applications, member records and AGM papers for the co-op.

+1-555-0164
D-02

Fund & grants

Grant applications, the panel and the bill discount list.

+1-555-0164
D-03

Site line · 24/7

Noise, traffic or anything on site that can’t wait until morning.

+1-555-0165
D-04

Press & partners

Media, landowners, suppliers and county officers.

+1-555-0164
Next step / Come and ask

Questions about shares, sound or the fund? Ask the people who build the farms.

FREE · NO BOOKING · A REAL PERSON REPLIES IN TWO WORKING DAYS