Four farms turning, one being built and three moving through studies and permits. Each card lists the turbines, the community share and what the local fund pays — the same facts, every site.
Every operating site pays into its local fund from the first megawatt-hour and gives neighbours within two miles a $320 bill discount.





From a wind mast on Tamsin Flats to cranes on Hartfell Edge. Every pipeline site has drop-in days before anything is drawn, and a share offer before anything is built.




Every site sits on the same upland ridge west of Larch Valley, within an hour of the O&M base at Calder Ridge — so a technician can reach any turbine on the same shift.

P50 is the output we expect in an average wind year. We publish the gap for every farm, including the years the wind didn’t blow.
One farm ran under P50 in 2025: Calder Ridge lost five weeks on T9 to a gearbox exchange. Bracken Rise stayed above forecast despite stopping at dusk through the spring bat season. Both notes are published.