4 wind farms operating · 201 MW · 2,340 neighbours hold shares
Home / Projects / Whinfell
FILE WW-P13 · REV. 10/2026
[ Project WW-03 · Operating ]

Whinfell,
our highest ridge.

Nine turbines at 610 metres above the Owen County dales — our windiest site and our hardest winters. In 2025 it made 5.2% more power than forecast.

OPERATING SINCE 2021
OWEN COUNTY
610 M ABOVE SEA LEVEL
PROJECT FILE
WW-03 · REV. 10/26
36MW
9 × 4.0 MW cold-climate turbines with blade heating, about 112 GWh in an average year.
COMMUNITY SHARE
15% · 430 members
LOCAL FUND
$180,000 / yr
2025 VS P50
105.2%
 
ON THIS PAGE
01   Spec sheet
02   Timeline
03   Output
04   Gallery
01 / Spec sheet

Nine turbines where the snow stays longest.

Whinfell runs cold-climate turbines with blade heating and ice detection. Figures are metered at the export meter.

Wind turbines on a snow-dusted hill above a dry stone wall
WW-03
OPERATING · SINCE 2021
FIG. 01 — Whinfell above the dry-stone walls, January
PHOTO · JAN 2026
FIG. 01 — Whinfell above the dry-stone walls, January
PHOTO · JAN 2026
SPEC SHEET · WHINFELL
REV. 10/26
CAPACITY
36 MW
TURBINES
9 × 4.0 MW · cold-climate
SITE HEIGHT
610 m
YEARLY OUTPUT (P50)
≈ 112 GWh
2025 OUTPUT
117.8 GWh · 105.2% of P50
COMMUNITY SHARE
15% · 430 members
LOCAL FUND
$180,000 / yr
BILL DISCOUNT
318 homes · $320 / yr
OPERATING SINCE
2021
CHALLENGE
The best wind in our pipeline — and ice, a single winter road and a ridge seen from three dales and a national scenic route.
OUR RESPONSE
Cold-climate turbines with blade heating, ice detection that stops a turbine before a blade sheds, and nine turbines placed from 22 viewpoints.
RESULT
Above forecast in four of five years, no ice-throw incidents, and the winter road now gritted by the farm’s own crew for the village too.
02 / Timeline

Built for winter.

The construction season up here is five months long. We planned the whole build around it.

2016
 
Wind mast
The windiest mast data we have ever logged — and the coldest.
MEASURE
2018
 
Viewpoint study
Photomontages from 22 viewpoints chosen by the dales’ villages.
LISTEN
2019
 
Permit granted
Nine turbines approved with 30 conditions, ice protocol included.
PERMIT
2020
 
Summer build
Foundations to lift in one five-month season.
BUILD
2021
 
First power
Nine turbines turning; the Owen County fund opens.
LIVE
2025
 
Best year yet
105.2% of P50 and 98.4% availability through the winter.
O&M
610M
Highest Westerly site
$0.9M
Local fund paid to date
430MEMBERS
Community shareholders
0INCIDENTS
Ice-throw incidents since 2021
03 / Output

The windiest ridge, above forecast.

Whinfell matched or beat its monthly P50 in every month of 2025 — even the calm weeks of summer.

MONTHLY OUTPUT · 2025 VS P50 · GWh
P50
2025
 
4 GWh
 
8 GWh
 
12 GWh
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
2025 · 105.2% OF P50
BLADE HEATING 214 H
98.4% AVAILABLE
WHERE IT WENT LOCALLY
2024 VS 2025
LINE
2024
2025
Local fund
$180,000
$180,000
Bill discounts
$99,200
$101,760
Winter road gritting
$22,000
$26,000
Total
$301,200
$307,760
105.2%
OF P50, 2025
98.4%
TURBINE AVAILABILITY
04 / Neighbour voice
“They let us pick the viewpoints for the photomontages. You still see the turbines from the lane — but they’re where we said we could live with them.”
AG
Alun Griffiths
SHEEP FARMER · WHINFELL DALE
WINTER LOG
WHINFELL · 2025–26
ITEM
PLAN
ACTUAL
Ice stops
≤ 30
19
Blade heating hours
300
214
Road closed days
≤ 10
6
Availability
97.0%
98.4%
Ice stops are automatic; each one is logged and reviewed by the O&M base.
MORE FROM THE REGISTER
A line of wind turbines along a grassy ridge at golden hour
PREVIOUS · WW-02

Pell Moor

Operating · Larch County · 63 MW
Aerial view of wind turbines across green farmland with an access track
NEXT · WW-04

Bracken Rise

Operating · Owen County · 54 MW
Next step / Come and ask

Questions about shares, sound or the fund? Ask the people who build the farms.

FREE · NO BOOKING · A REAL PERSON REPLIES IN TWO WORKING DAYS