4 wind farms operating · 201 MW · 2,340 neighbours hold shares
Home / Projects / Pell Moor
FILE WW-P13 · REV. 10/2026
[ Project WW-02 · Operating ]

Pell Moor,
one fifth owned locally.

Fifteen turbines on open moorland west of Larch Valley, and the first Westerly farm with a 20% community share. In 2025 its fund gave out $412,000 in 61 grants.

OPERATING SINCE 2019
LARCH COUNTY
20% COMMUNITY-OWNED
PROJECT FILE
WW-02 · REV. 10/26
63MW
15 × 4.2 MW turbines, about 190 GWh in an average wind year.
COMMUNITY SHARE
20% · 720 members
LOCAL FUND
$315,000 / yr
GRANTED IN 2025
$412,000
 
ON THIS PAGE
01   Spec sheet
02   Timeline
03   Output
04   Gallery
01 / Spec sheet

Fifteen turbines on the moor, owned in part by the moor.

Figures from the as-built drawings and the export meter. Pell Moor ran 4% above its P50 forecast in 2025.

A line of wind turbines along a grassy ridge at golden hour
WW-02
OPERATING · SINCE 2019
FIG. 01 — The Pell Moor line at golden hour
PHOTO · SEP 2025
FIG. 01 — The Pell Moor line at golden hour
PHOTO · SEP 2025
SPEC SHEET · PELL MOOR
REV. 10/26
CAPACITY
63 MW
TURBINES
15 × 4.2 MW
YEARLY OUTPUT (P50)
≈ 190 GWh
2025 OUTPUT
197.6 GWh · 104.0% of P50
COMMUNITY SHARE
20% · 720 members
LOCAL FUND
$315,000 / yr
BILL DISCOUNT
612 homes · $320 / yr
OPERATING SINCE
2019
CHALLENGE
Open moorland with curlew and golden plover, a popular walking route over the top, and neighbours who wanted more than a fund — they wanted a stake.
OUR RESPONSE
Turbines kept off the nesting ground, the path rerouted with the walking club, and the first 20% community share offer through the co-op.
RESULT
4% above forecast in 2025, 720 local members, and a fund the moor’s villages now plan their year around.
02 / Timeline

From moorland survey to 720 members.

Pell Moor was the first farm where the share offer came before the build — every later farm follows the same order.

2014
 
Wind mast
Two years of wind and three of bird surveys on the moor.
MEASURE
2016
 
Path rerouted
Layout agreed with the walking club and the moorland trust.
LISTEN
2017
 
Permit granted
Fifteen turbines, 33 conditions, nesting ground left untouched.
PERMIT
2018
 
Share offer
The co-op’s first offer: 20% of the farm, raised in eleven weeks.
SHARES
2019
 
First power
Fifteen turbines turning; the fund opens its first round.
LIVE
2025
 
Record fund year
$412,000 granted in 61 grants, the most from any Westerly farm.
FUND
7YEARS
Operating since 2019
$2.2M
Local fund paid to date
720MEMBERS
Community shareholders
612HOMES
With the $320 bill discount
03 / Output

A windy winter, a steady year.

February 2025 was the windiest month on record at the moor’s mast. Over the year Pell Moor made 4% more power than its P50 forecast.

MONTHLY OUTPUT · 2025 VS P50 · GWh
P50
2025
 
5 GWh
 
10 GWh
 
15 GWh
 
20 GWh
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
2025 · 104.0% OF P50
WINDIEST FEBRUARY ON RECORD
98.1% AVAILABLE
WHERE IT WENT LOCALLY
2024 VS 2025
LINE
2024
2025
Local fund paid in
$315,000
$315,000
Carried from last year
$41,000
$97,000
Bill discounts
$192,000
$195,840
Total
$548,000
$607,840
104.0%
OF P50, 2025
$412k
GRANTED IN 2025
04 / Neighbour voice
“We asked for a stake, not a handout. Now the moor turns, the path is better than before, and the co-op AGM gets more people than the parish meeting.”
DO
Dev Oyelaran
CO-OP MEMBER SINCE 2018 · PELL MOOR WALKING CLUB
FUND 2025
PELL MOOR · 61 GRANTS
USE
GRANTS
PAID
Halls & buildings
9
$118k
Schools & youth
17
$96k
Paths & nature
12
$84k
Energy saving at home
23
$114k
Every grant is listed in the 2025 fund note on the News page.
MORE FROM THE REGISTER
Wind farm substation and battery containers behind a palisade fence
PREVIOUS · WW-01B

Calder Ridge Battery Yard

Operating · Larch County · 40 MWh
Wind turbines on a snow-dusted hill above a dry stone wall
NEXT · WW-03

Whinfell

Operating · Owen County · 36 MW
Next step / Come and ask

Questions about shares, sound or the fund? Ask the people who build the farms.

FREE · NO BOOKING · A REAL PERSON REPLIES IN TWO WORKING DAYS