Fifteen turbines on open moorland west of Larch Valley, and the first Westerly farm with a 20% community share. In 2025 its fund gave out $412,000 in 61 grants.
Figures from the as-built drawings and the export meter. Pell Moor ran 4% above its P50 forecast in 2025.

Pell Moor was the first farm where the share offer came before the build — every later farm follows the same order.
February 2025 was the windiest month on record at the moor’s mast. Over the year Pell Moor made 4% more power than its P50 forecast.