4 wind farms operating · 201 MW · 2,340 neighbours hold shares
Home / Projects / Battery Yard
FILE WW-P13 · REV. 10/2026
[ Project WW-01B · Operating ]

Calder Ridge Battery Yard,
storing the evening wind.

Ten battery containers beside our oldest farm. They charge when the wind blows at night and the grid doesn’t need it, and give it back at the evening peak.

OPERATING SINCE 2024
LARCH COUNTY
99.1% AVAILABLE
PROJECT FILE
WW-01B · REV. 10/26
40MWh
20 MW / 40 MWh of lithium iron phosphate storage in ten containers, sharing Calder Ridge’s grid connection.
POWER / ENERGY
20 MW / 40 MWh
FIRST WINTER CYCLES
312
AVAILABILITY
99.1%
 
ON THIS PAGE
01   Spec sheet
02   Timeline
03   Output
04   Gallery
01 / Spec sheet

Ten containers, one shared connection.

The yard uses Calder Ridge’s existing substation and grid connection — no new line, no new pylons. Figures from the first full winter, 2025–26.

Wind farm substation and battery containers behind a palisade fence
WW-01B
OPERATING · SINCE DEC 2024
FIG. 01 — Battery containers behind the substation fence
PHOTO · FEB 2026
FIG. 01 — Battery containers behind the substation fence
PHOTO · FEB 2026
SPEC SHEET · BATTERY YARD
REV. 10/26
POWER / ENERGY
20 MW / 40 MWh
DURATION
2 hours at full power
CONTAINERS
10 · lithium iron phosphate
CONNECTION
Shared with Calder Ridge
CYCLES, WINTER 2025–26
312
AVAILABILITY
99.1% (winter 2025–26)
FIRE SYSTEM
Per-container detection + suppression
OPERATING SINCE
Dec 2024
CHALLENGE
Calder Ridge makes its most power on windy winter nights, when the grid needs it least — and the evening peak often comes when the wind has dropped.
OUR RESPONSE
Two hours of storage on the farm’s own connection: charge overnight, discharge from 16:00 to 20:00, inside the existing substation fence line.
FIRST WINTER
312 full cycles, 99.1% availability and no fire-system alarms. The fire service walked the yard twice and signed off the plan.
02 / Timeline

From fire plan to first winter.

The yard was built inside a year, but most of that year went on the fire plan and the drainage — the two questions neighbours asked first.

2023
 
Neighbour meeting
Fire, noise and drainage top the list; each gets its own study.
LISTEN
EARLY 2024
 
Permit & fire plan
County permit and a fire plan agreed with the Larch fire service.
PERMIT
MID 2024
 
Build
Ten containers, one inverter house, new drainage pond.
BUILD
DEC 2024
 
Energised
Commissioned on the Calder Ridge connection.
LIVE
WINTER 25–26
 
First full winter
312 cycles, 99.1% available.
O&M
APR 2026
 
Winter report
Published on the News page with every alarm and outage logged.
REPORT
312CYCLES
In the first full winter
99.1%
Availability, winter 2025–26
10UNITS
Battery containers
0ALARMS
Fire-system alarms so far
03 / Cycles

Busiest when the nights are longest.

The yard works hardest from October to March, when windy nights and dark evenings coincide. The winter came in 4% under forecast cycles — and 99.1% available.

FULL CYCLES PER MONTH · APR 2025 – MAR 2026
FORECAST
ACTUAL
 
20 cycles
 
40 cycles
 
60 cycles
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
312 WINTER CYCLES
DISCHARGE 16:00–20:00
99.1% AVAILABLE
FIRST WINTER LOG
OCT 2025 – MAR 2026
ITEM
PLAN
ACTUAL
Full cycles
326
312
Availability
98.5%
99.1%
Planned outages
3
2
Fire-system alarms
n/a
0
312
CYCLES, FIRST WINTER
99.1%
AVAILABILITY
04 / Neighbour voice
“We asked about fire first, and they brought the fire chief to the meeting. Now the yard hums a bit on a still evening — and that’s about it.”
SN
Sam Novak
NEIGHBOUR · CALDER LANE
NEIGHBOUR CHECKS
BATTERY YARD · 2025
CHECK
LIMIT
MEASURED
Noise at nearest home
35 dB(A)
29 dB(A)
Drainage pond level
Below spill
OK
Fire service visits
2 / yr
2
Complaints
Log all
1
The one complaint (inverter hum, March 2025) was fixed with a new fan profile within two weeks.
MORE FROM THE REGISTER
Wind turbines on a misty green ridge at sunrise, with a battery yard beside the access road
PREVIOUS · WW-01

Calder Ridge

Operating · Larch County · 48 MW
A line of wind turbines along a grassy ridge at golden hour
NEXT · WW-02

Pell Moor

Operating · Larch County · 63 MW
Next step / Come and ask

Questions about shares, sound or the fund? Ask the people who build the farms.

FREE · NO BOOKING · A REAL PERSON REPLIES IN TWO WORKING DAYS