Twelve turbines on the Larch County ridge since 2016 — the farm that taught us how to build with neighbours. In 2024 we added a 20 MW battery yard beside the substation.
Figures from the as-built drawings and ten years of export-meter data. The 2025 column below is metered, not modelled.

From the first drop-in in a school hall to the battery yard that now evens out the evening peak.
Wind farms make most of their power in winter. 2025 tracked P50 except May and June, when T9 was stopped for a gearbox exchange.