4 wind farms operating · 201 MW · 2,340 neighbours hold shares
Home / Projects / Bracken Rise
FILE WW-P13 · REV. 10/2026
[ Project WW-04 · Operating ]

Bracken Rise,
turbines among the crops.

Thirteen turbines on four working farms in Owen County. The fields are still ploughed and grazed right up to the tower doors — the farms lost less than 1% of their land.

OPERATING SINCE 2023
OWEN COUNTY
4 WORKING FARMS
PROJECT FILE
WW-04 · REV. 10/26
54MW
13 × 4.2 MW turbines across four farms, about 160 GWh in an average wind year.
COMMUNITY SHARE
20% · 580 members
LOCAL FUND
$270,000 / yr
FARMLAND USED
< 1% · 5.2 ha
 
ON THIS PAGE
01   Spec sheet
02   Timeline
03   Output
04   Gallery
01 / Spec sheet

Thirteen turbines, four farms, one shared track.

Figures from the as-built drawings and the export meter. Bracken Rise curtails at dusk in April–June under its bat permit, by design.

Aerial view of wind turbines across green farmland with an access track
WW-04
OPERATING · SINCE 2023
FIG. 01 — Bracken Rise across the spring fields
DRONE SURVEY · MAY 2025
FIG. 01 — Bracken Rise across the spring fields
DRONE SURVEY · MAY 2025
SPEC SHEET · BRACKEN RISE
REV. 10/26
CAPACITY
54 MW
TURBINES
13 × 4.2 MW
YEARLY OUTPUT (P50)
≈ 160 GWh
2025 OUTPUT
162.4 GWh · 101.5% of P50
LAND USED
5.2 ha of 640 ha farmed
COMMUNITY SHARE
20% · 580 members
LOCAL FUND
$270,000 / yr
BILL DISCOUNT
670 homes · $320 / yr
OPERATING SINCE
2023
CHALLENGE
Four family farms, two of them dairy, who wanted turbines without losing a season of crops or a single gateway to the milking parlour.
OUR RESPONSE
One shared track along existing field edges, crane pads that went back to grass, and a build programme timed around harvest and calving.
RESULT
Under 1% of the land used, every field farmed in 2023, and output above forecast even with the spring bat curtailment.
02 / Timeline

Planned around harvest.

The build calendar was set by the four farms, not the other way round.

2017
 
Farm meetings
Four families, one kitchen table, eighteen months of layout drafts.
LISTEN
2019
 
Studies
Bats, soils and drainage; the track follows the old field edges.
STUDY
2021
 
Permit granted
Thirteen turbines, 34 conditions including dusk curtailment.
PERMIT
2022
 
Share offer
20% of the farm offered through the co-op; 580 members joined.
SHARES
2023
 
First power
Built between harvests; every field farmed that year.
LIVE
2025
 
Bat curtailment
Dusk stops in spring cost 0.4% of output — and no bat casualties found.
ECOLOGY
5.2HA
Farmland used, of 640 ha
$0.8M
Local fund paid to date
580MEMBERS
Community shareholders
670HOMES
With the $320 bill discount
03 / Output

Above forecast, even with the bats counted in.

From April to June the turbines stop at dusk on low-wind nights, when bats feed. That shows in the spring bars — and is part of the plan.

MONTHLY OUTPUT · 2025 VS P50 · GWh
P50
2025
 
5 GWh
 
10 GWh
 
15 GWh
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
2025 · 101.5% OF P50
DUSK STOPS APR–JUN
0 BAT CASUALTIES FOUND
WHERE IT WENT LOCALLY
2024 VS 2025
LINE
2024
2025
Local fund
$270,000
$270,000
Bill discounts
$208,000
$214,400
Farm & land payments
$412,000
$418,000
Total
$890,000
$902,400
101.5%
OF P50, 2025
< 1%
OF THE FARMLAND USED
04 / Neighbour voice
“We milk twice a day, whatever’s being built. They worked round us — the track goes where the old hedge was, and the cows graze to the tower door.”
RB
Rosa Bennett
DAIRY FARMER · BRACKEN RISE LANDOWNER
BAT MONITORING
BRACKEN RISE · 2025
ITEM
PERMIT
ACTUAL
Dusk stop nights
As needed
48
Output lost
≤ 1.0%
0.4%
Searches under turbines
52
52
Casualties found
Report all
0
Independent ecologist’s searches, reported to the county every autumn.
MORE FROM THE REGISTER
Wind turbines on a snow-dusted hill above a dry stone wall
PREVIOUS · WW-03

Whinfell

Operating · Owen County · 36 MW
Construction crew beside a freshly poured wind turbine foundation
NEXT · WW-05

Hartfell Edge

Building · Sable County · 84 MW
Next step / Come and ask

Questions about shares, sound or the fund? Ask the people who build the farms.

FREE · NO BOOKING · A REAL PERSON REPLIES IN TWO WORKING DAYS