4 wind farms operating · 201 MW · 2,340 neighbours hold shares
Home / Projects / Norrow Hill
FILE WW-P13 · REV. 10/2026
[ Project WW-07 · Planning ]

Norrow Hill,
application filed.

Eighteen proposed turbines on Norrow Hill in Larch County. After 24 months of studies the application went to the county in October 2026 — come and see it at Norrow Grange Hall on 8 November.

APPLICATION FILED OCT 2026
LARCH COUNTY
DROP-IN SAT 08 NOV
PROJECT FILE
WW-07 · REV. 10/26
72MW PROPOSED
18 × 4.0 MW turbines proposed, with a county decision expected in 2027.
STUDIES
24 months complete
HABITAT PLAN
3 ha restored for every 1 used
DECISION
Expected 2027
 
ON THIS PAGE
01   Proposal
02   Timeline
03   Neighbour voice
04   Gallery
01 / Spec sheet

Eighteen turbines, proposed — and open to comment.

Everything below is from the application as filed. Nothing is decided: the county consultation runs into 2027, and the layout can still change.

Restored wildflower meadow with grazing cattle and wind turbines behind
WW-07
PROPOSED · OCT 2026
FIG. 01 — Meadow below the Norrow ridge, proposed restoration area
PHOTO · JUN 2026
FIG. 01 — Meadow below the Norrow ridge, proposed restoration area
PHOTO · JUN 2026
PROPOSAL · NORROW HILL
AS FILED
CAPACITY
72 MW (proposed)
TURBINES
18 × 4.0 MW
STUDIES
24 months complete
HABITAT
3:1 restoration plan
APPLICATION
Filed Oct 2026
COMMUNITY SHARE
Up to 20% if permitted
LOCAL FUND
$360,000 / yr from first power
DECISION
Expected 2027
THE SITE
A broad, windy hill above Norrow village: rough grazing, a hen harrier hunting range on the north slope and views from three valley roads.
WHAT WE PROPOSE
Eighteen turbines kept off the north slope, a new access from the county road, and 3 hectares of upland meadow restored for every hectare used.
WHAT HAPPENS NOW
The county consults on the application into 2027. Every comment you send to us is answered — and copied to the county if you ask.
02 / Timeline

Two years of studies, now your turn.

Dates after October 2026 depend on the county’s decision — they are a plan, not a promise.

2023
 
Wind mast
Mast up on the summit; first drop-in at Norrow Grange.
MEASURE
2024
 
Studies start
Birds, bats, noise, landscape, water and soils — 24 months.
STUDY
2025
 
Layout changed
Four turbines moved off the hen harrier range on the north slope.
LISTEN
OCT 2026
 
Application filed
Application, studies and photomontages filed with the county.
NOW
2027
 
County decision
Consultation, then a vote by the county board.
NEXT
2028+
 
Share offer & build
Only if permitted: share offer first, construction after.
PLANNED
24MONTHS
Of environmental studies
4TURBINES
Moved off the north slope
3:1HABITAT
Hectares restored per hectare used
11VIEWS
Photomontage viewpoints
03 / Neighbour voice
“I’m not sold yet, and I told them so. But they moved four turbines when the harrier survey came back, and they’ve put my questions in writing. I’ll be at the drop-in.”
EW
Eleanor Wright
NORROW VILLAGE · 1.8 MILES FROM THE NEAREST TURBINE
STUDY REGISTER
NORROW HILL · AS FILED
STUDY
MONTHS
STATUS
Birds incl. hen harrier
24
Filed
Bats
24
Filed
Noise & flicker
12
Filed
Landscape & views
12
Filed
All study reports are available at the site office and at the 8 November drop-in.
MORE FROM THE REGISTER
Upland farmland with a wind farm on the ridge
PREVIOUS · WW-06

Ashby Downs

Permitted · Sable County · 56 MW
Wind measurement mast on open moorland with a parked four-by-four
NEXT · WW-08

Tamsin Flats

Scoping · Owen County · 40 MW
Next step / Drop-in · Sat 08 Nov

See the Norrow Hill application at Norrow Grange Hall, 10:00–14:00.

FREE · NO BOOKING · A REAL PERSON REPLIES IN TWO WORKING DAYS