4 wind farms operating · 201 MW · 2,340 neighbours hold shares
Home / Projects / Ashby Downs
FILE WW-P13 · REV. 10/2026
[ Project WW-06 · Permitted ]

Ashby Downs,
permitted with 38 conditions.

Fourteen turbines on the chalk downs of Sable County. The county granted the permit in May 2026; the share offer opens in 2028, before a single foundation is dug.

PERMITTED MAY 2026
SABLE COUNTY
SHARE OFFER 2028
PROJECT FILE
WW-06 · REV. 10/26
56MW
14 × 4.0 MW turbines planned, with construction expected from 2028.
PERMIT
May 2026 · 38 conditions
COMMUNITY SHARE
Offer planned 2028
LOCAL FUND
$280,000 / yr from first power
 
ON THIS PAGE
01   Spec sheet
02   Timeline
03   Neighbour voice
04   Gallery
01 / Spec sheet

Fourteen turbines, one permit, a long list of promises.

Figures from the permitted application. Output is the P50 estimate from three years of mast data; it will be refined before the share offer.

Upland farmland with a wind farm on the ridge
WW-06
PERMITTED · MAY 2026
FIG. 01 — The downs from the Ashby road, looking west
PHOTOMONTAGE BASE · 2024
FIG. 01 — The downs from the Ashby road, looking west
PHOTOMONTAGE BASE · 2024
SPEC SHEET · ASHBY DOWNS
REV. 10/26
CAPACITY
56 MW
TURBINES
14 × 4.0 MW
YEARLY OUTPUT (P50)
≈ 165 GWh (estimate)
PERMIT
May 2026 · 38 conditions
COMMUNITY SHARE
Up to 20% · offer 2028
LOCAL FUND
$280,000 / yr from first power
CONSTRUCTION
2028 (planned)
CHALLENGE
Open chalk grassland with skylarks, a scheduled earthwork on the skyline and a village that had seen two earlier wind schemes fail.
OUR RESPONSE
Fourteen turbines instead of the original twenty, kept 600 m from the earthwork, and a grassland restoration plan on the arable fields below.
PERMIT
Granted in May 2026 with 38 conditions — from construction hours to skylark plots — each tracked in a public register.
02 / Timeline

Four years to a permit, two to the build.

The share offer comes before construction, as on every Westerly farm. Dates after 2026 are plans, not promises.

2022
 
Wind mast
Three years of wind data and two of skylark surveys.
MEASURE
2023
 
Drop-in days
9 events and a layout cut from twenty turbines to fourteen.
LISTEN
2024
 
Application
Filed with photomontages from 18 viewpoints.
APPLY
MAY 2026
 
Permit granted
38 conditions, including skylark plots and construction hours.
NOW
2028
 
Share offer
Up to 20% offered to neighbours before construction.
PLANNED
2028–29
 
Construction
Foundations to first power, if the offer and finance close on time.
PLANNED
38CONDITIONS
In the May 2026 permit
14TURBINES
Cut from 20 in the first draft
600M
Kept from the scheduled earthwork
18VIEWS
Photomontage viewpoints
03 / Neighbour voice
“Two schemes came and went here without anyone asking us anything. This time they cut six turbines off the plan after the drop-ins — that’s when people started listening back.”
PK
Priya Kaur
ASHBY PARISH COUNCIL
CONDITION REGISTER
ASHBY DOWNS · 2026
AREA
CONDITIONS
STATUS
Ecology & skylarks
11
Pre-build
Heritage & landscape
8
Pre-build
Traffic & hours
10
Pre-build
Noise & flicker
9
Pre-build
Every condition gets a status line in the quarterly report from the first day of construction.
MORE FROM THE REGISTER
Construction crew beside a freshly poured wind turbine foundation
PREVIOUS · WW-05

Hartfell Edge

Building · Sable County · 84 MW
Restored wildflower meadow with grazing cattle and wind turbines behind
NEXT · WW-07

Norrow Hill

Planning · Larch County · 72 MW
Next step / Live near Ashby?

Ask about the Ashby Downs conditions — or the 2028 share offer.

FREE · NO BOOKING · A REAL PERSON REPLIES IN TWO WORKING DAYS