Healthcare security and compliance
Healthcare security and compliance
Clinical engineer checking a powered-down infusion pump and its network link from a laptop with a dark console in a bright hospital equipment bay

§1Method

Nothing
moves without
a window.

Each unit agrees its window with us, clinical engineering signs off the device list, and your privacy officer sees the plan first. Here is the year, set out in advance.

§2Days 1 to 30

Thirty days to a first-cut register with names on it.

Days
1 to 7
Days
8 to 14
Days
15 to 21
Days
22 to 30
We do

Days 1 to 7: Scope call, business associate agreement, read of your last risk analysis

Days 8 to 14: Interviews with privacy, IT, clinical engineering and nurse managers

Days 15 to 21: Site walks and a device count with clinical engineering, read-only

Days 22 to 30: Walk through the first-cut register with your privacy officer

You give

Days 1 to 7: Contracts and one contact

Days 8 to 14: An hour from each owner

Days 15 to 21: An escort on each unit and the device list

Days 22 to 30: One meeting with leadership

You get

Days 1 to 7: Scope note and a signed agreement

Days 8 to 14: Interview notes and open questions

Days 15 to 21: Device list by class

Days 22 to 30: First-cut register with owners

No patient records are opened. Access ends when the work ends, as the scope note says.

§3Documents

Clinical engineer tracing the network cable from a bedside patient monitor to the wall port in an empty patient room

What lands on your desk, and when.

Everything we write is yours to keep, in your own file store. If we leave, the register and the window plan stay.

Document

It answers

Read by

Day

Scope note

What are we covering?

Privacy officer

1

Risk register

What is missing, and who fixes it?

Gap owners

30

Full risk analysis

How does each safeguard score?

Privacy officer

56

Device list

What is on the network?

Clinical engineering

21

Window plan

When can each unit change?

Nurse managers

90

Drill report

Did failover hold?

Leadership

365

§4Year one

Twelve months on one chart.

A typical hospital plan. Your dates follow your units' windows.

1
2
3
4
5
6
7
8
9
10
11
12
Day 1

Scope and agreement

We list your sites, your units and the rules behind them, and sign the business associate agreement.

A one-page scope note is yours on day 1.

Day 1 to week 8

Risk analysis

A first-cut register at day 30, every gap with an owner and a date. The full scored analysis by week 8.

You get the register, then the full analysis.

Days 31 to 90

Devices and windows

The device list from day 21 is checked on the floor. Each unit agrees its change window.

You get a window plan.

Months 3 to 9

Segments and keys

Device classes move to their own segments, a unit at a time. Hardware keys go out, night shift first.

You get a change log after every window.

Months 10 to 12, to day 365

Drill and review

A downtime drill with the units that rely on failover, then the risk analysis is redone.

You get a drill report and next year's register.

§5Meetings

From day 90, three meetings keep it moving.

Every 14 days

Change review

What ran, what rolled back, which unit is next.

Every 30 days

Privacy officer

Open gaps, new devices and what vendors asked for.

Every 90 days

Leadership paper

One short paper: where the register stands, what changed and the next drill date.

After day 90, sample
3

standing meetings, each with a written note sent the same day.

Hospital security team at work in a comms room: two at laptops, one at an open rack, two beside a network graph on the wall screen

§6Your plan

Hospital security team at work in a comms room: two at laptops, one at an open rack, two beside a network graph on the wall screen