Healthcare security and compliance
Healthcare security and compliance

§1Case CS-01

Hospitals. HIPAA Security Rule. Sample case, fictional client. Findings: Critical 2, High 9, Low 31.

A full downtime drill across a regional hospital group

Clinical engineer tracing the network cable from a bedside patient monitor to the wall port in an empty patient room
Drill findings, drill night to sign-off
42
0
38 minutes to contain

Case sheet

Client

Regional hospital group, 3 sites

Rule

HIPAA Security Rule

Work

Clinical network failover, 6 units

Time taken

38 minutes to contain

Result

Risk analysis closed out, demo sample

A failover nobody had tried with patients on the ward.

Where they started

The group had a clinical network failover on paper for three years. Nobody had run it with units relying on it, and the risk analysis listed it as an open gap.

What we did

Grace planned the drill like any change: a window agreed with six units, a rollback written first, and nursing told what they would see. It ran on a Tuesday night.

Where it ended

Fault to contained took 38 minutes. The 42 findings were written up that night, each with a severity and an owner, and the last one closed before the risk analysis was signed off.

§2Client note

The drill ran on a Tuesday night. Nursing heard about it from the report.

Renee Alvarez, privacy officer, regional hospital group. Sample quote, fictional person.

What changed

A failover tested with the units on it

Downtime forms current on every unit

Named admin accounts on the failover switches

§3Timeline

Twelve weeks, drill night in the middle.

Sample timeline. The last column counts what is still open.

When

Step

By

Open

Week 1

Scope call, six units and the failover pair listed

Grace

Not run

Week 2

Windows agreed with each unit and with nursing

Victor

Not run

Week 3

Rollback written, clinical engineering briefed

Victor

Not run

Drill night

Simulated fault, contained 38 minutes later

Grace

42

Next morning

Report with every finding, its severity and owner

Grace

42

Week 6

Critical and high findings closed

Client

31

Week 12

Last finding closed. Risk analysis signed off.

Asha

0

Afterwards

Month 6

Second drill booked in the same window

Grace

0

Yearly

Drill added to the risk analysis calendar

Asha

0

§4What we found

Forty-two findings. Four shown in full.

Area

Finding

Closed

Failover

Second link took nine minutes to carry traffic

Week 6

Devices

Twelve monitors lost the central station until a restart

Week 6

Runbook

Downtime forms out of date on two units

Week 4

Access

Shared admin account on the failover switches

Week 6

The other 38 findings stay in the client's register.

Hospital security team at work in a comms room: two at laptops, one at an open rack, two beside a network graph on the wall screen
Count, sample client

First count

42

Closed

42

Open at the end

0

§5More cases