Reading IEC 62443 without a consultant in the room

Engineer at a control desk behind glass overlooking a dark warehouse floor

IEC 62443 runs to many parts, and most plant managers never need to read all of them. Three ideas carry most of the weight on a site.

Three ideas

  • Zones and conduits: group devices, then control the paths between groups.
  • Security levels: decide how hard each zone should be to reach.
  • Roles: the owner, the integrator and the vendor each have their own part.

Start with the first. A zone drawing your team agrees on is worth more than a full gap list nobody reads.

An auditor is not looking for a perfect plant. An auditor is looking for a plan that runs.

Write down the exceptions

Every plant has an old unit that cannot meet the target. Write down why, what shields it, and when it gets replaced. That page answers most audit questions before they are asked.