Plant line, 24/7 +1-555-0164[email protected]

Site report SR-207. Water. 5 windows, all signed.
Fictional client, sample figures

A water utility listens to 31 pump stations

§1 Site sheetSR-207 / Sample figures

Engineer kneeling with a clipboard at a network cabinet in a plant room
Pump stations on one sensor network
31
268 devices, no outage at any station

Site sheet

Sector

Water, one utility

Scope

1 treatment plant, 31 pump stations, 268 devices

Findings

3 High, 14 Low

Windows

5 used, all signed

Result

Every remote station now on one sensor network

Thirty one stations, and nobody had seen their traffic.

Written for the plant manager: what we found on the floor, how the work ran, and what is different now.

§2.1 On the floor

One treatment plant and 31 pump stations, spread over two counties. Each station reported over a cellular link, and the only record of what sat inside was the integrator's drawings.

§2.2 How we worked

One sensor went in at the treatment plant, where every station link lands. Four weeks of listening found 268 devices, and three stations that could still be reached from the internet through a modem setting.

§2.3 Now

Five signed windows closed the three High findings. Every station now reports through one sensor network, and night alerts reach the duty operator in plain words.

§3 FindingsSR-207 / Sample figures

Industrial firewall and switches with patched cables in a dark cabinet
Totals, SR-207

High

3

Low

14

Windows used

5

Seventeen findings. The three High ones in full.

Severity

Finding

Status

High

Three stations reachable from the internet

Closed in W1

High

One password on every station controller

Closed in W3

High

No alert when station logic changes

Closed in W5

Low

Drawings missing two newer stations

Updated, week 5

13 more Low findings are in the client's copy of SR-207.

§4 Window logSR-207 / Sample figures

Five windows, each one signed.

Copied from the site log. Every window had a date, a rollback and a signature before it opened.

When

Work

Signed by

Line

Week 1

Sensor at the treatment plant, on the station links

Operations manager

No outage

Weeks 1 to 4

Listen to all 31 stations and build the list

Wardline

No outage

Week 5

List and findings reviewed with the operations manager

Operations manager

No outage

W1

Modem settings closed on stations 4, 11 and 27

Operations manager

Signed window

W2

Station passwords changed, north group

Operations manager

Signed window

W3

Station passwords changed, south group

Operations manager

Signed window

W4

Treatment plant firewall rules for the station links

Operations manager

Signed window

W5

Logic change alerts on, tested with a planned edit

Operations manager

Signed window

Afterwards

Month 2

First monthly monitoring report

Wardline

Monthly

Month 6

A replaced controller at station 19 listed the day it spoke

Sensor

Listed

§5 Plant noteSR-207 / Sample figures

For the first time I can see all thirty one stations from one screen. Nobody had to drive out and switch anything off.

Operations manager, water utility. Fictional.
What changed

No station reachable from the internet

A password per station, held by the utility

An alert when station logic changes

§6 More site reportsEnd of SR-207