Site report SR-199. Power. 4 windows, all signed.
Fictional client, sample figures

A generating site closes two links nobody listed

§1 Site sheetSR-199 / Sample figures

Engineer at a control room desk with network and process screens above a plant floor
Remote links nobody had listed
2
Both closed in signed windows

Site sheet

Sector

Power, one generating site

Scope

1 plant, 2 substations, 190 devices

Findings

1 High, 6 Low

Windows

4 used, all signed

Result

Two unknown remote links closed

Two links into the substation, missing from every drawing.

Written for the plant manager: what we found on the floor, how the work ran, and what is different now.

§2.1 On the floor

A generating site with two substations. The drawings showed one remote path, through the plant DMZ, for the grid operator's data feed. Everyone on site had signed them off for years.

§2.2 How we worked

Three weeks of listening showed 190 devices and two more paths. One was a cellular router left in a relay panel after commissioning. The other was a vendor link to the turbine controls that nobody on site could name.

§2.3 Now

Both links were closed in signed windows, during planned low load. The one remaining remote path runs through the DMZ, with a named owner and a log.

§3 FindingsSR-199 / Sample figures

Industrial firewall and switches with patched cables in a dark cabinet
Totals, SR-199

High

1

Low

6

Windows used

4

Seven findings. The High one in full.

Severity

Finding

Status

High

Two remote links missing from every drawing

Closed in W2

Low

Relay settings backup a year old

Closed in W4

Low

DMZ rules allowed more than the data feed

Closed in W3

4 more Low findings are in the client's copy of SR-199.

§4 Window logSR-199 / Sample figures

Four windows, each one signed.

Copied from the site log. Every window had a date, a rollback and a signature before it opened.

When

Work

Signed by

Line

Week 1

Sensors at both substations and the plant DMZ

Station manager

No outage

Weeks 1 to 3

Listen and build the list, 190 devices

Wardline

No outage

Week 4

Two unlisted links shown to the station manager

Station manager

No outage

W1

Cellular router removed from the relay panel

Station manager

Signed window

W2

Turbine vendor link closed, vendor moved to the DMZ gateway

Station manager

Signed window

W3

DMZ firewall rules rewritten, one path per purpose

Station manager

Signed window

W4

Relay settings checked against the running copy

Station manager

Signed window

Afterwards

Month 2

Asset list handed over for NERC CIP evidence

Wardline

Filed

Month 3

First monthly monitoring report

Wardline

Monthly

§5 Plant noteSR-199 / Sample figures

We had signed off those drawings for years, and two links were never on them. We closed both on our schedule, not theirs.

Station manager, generating site. Fictional.
What changed

Every remote path drawn, owned and logged

Turbine vendor through the DMZ gateway

No routers left in relay panels